Update patch set 9

Patch Set 9: Verified-1

Build FAILURE by Canonical OpenStack Charm CI.

Re-test comment options:

- 'recheck' (run/re-run the default upstream and charm test sets)
- 'charm-recheck' (run/re-run the default charm verify test set) with Jenkins and Zuul
- 'zosci-recheck' (run/re-run the default charm verify test set) with only Zuul

For more info, see http://docs.openstack.org/developer/charm-guide/ and https://wiki.openstack.org/wiki/ThirdPartySystems/Canonical_Charm_CI.


- charm-build https://openstack-ci-reports.ubuntu.com/artifacts/8cb/850186/9/check/charm-build/8cbea0e/ : SUCCESS in 10m 59s
- osci-lint https://openstack-ci-reports.ubuntu.com/artifacts/e41/850186/9/check/osci-lint/e4159a1/ : SUCCESS in 8m 37s
- tox-py38 https://openstack-ci-reports.ubuntu.com/artifacts/238/850186/9/check/tox-py38/238235d/ : FAILURE in 19m 24s
- kinetic-zed https://openstack-ci-reports.ubuntu.com/artifacts/e56/850186/9/check/kinetic-zed/e56334e/ : FAILURE in 14m 44s (non-voting)
- jammy-zed https://openstack-ci-reports.ubuntu.com/artifacts/b3b/850186/9/check/jammy-zed/b3b9548/ : FAILURE in 25m 21s (non-voting)
- jammy-yoga https://openstack-ci-reports.ubuntu.com/artifacts/a40/850186/9/check/jammy-yoga/a40f8ad/ : SUCCESS in 48m 47s

Patch-set: 9
Reviewer: Gerrit User 20648 <20648@4a232e18-c5a9-48ee-94c0-e04e7cca6543>
Label: Verified=-1
This commit is contained in:
Gerrit User 20648 2022-08-06 00:28:38 +00:00 committed by Gerrit Code Review
parent d92ec27abb
commit 503036166b

Diff Content Not Available