Instead of having validation be immediate when tasks are added
to the linear flow, follow the same paradigm as the graph_flow
where only upon connection (or determination of the order) will
tasks be connected/validated.
Change-Id: Ia8275ec88b0229f0793819249ae59fad0a2e9935