Database strategy for rolling upgrades
|
||||
======================================
|
||||
|
||||
https://blueprints.launchpad.net/glance/+spec/database-strategy-for-rolling-upgrades
|
||||
|
||||
This spec outlines a database modification strategy for Glance that will
|
||||
facilitate zero-downtime rolling upgrades and make it possible for Glance
|
||||
to assert the ``assert:supports-zero-downtime-upgrade`` tag.
|
||||
|
||||
Problem description
|
||||
===================
|
||||
|
||||
In order to apply the ``assert:supports-zero-downtime-upgrade`` tag [GVV2]_
|
||||
to Glance, the ``assert:supports-rolling-upgrade`` tag [GVV1]_ must first be
|
||||
asserted. It states that
|
||||
|
||||
The project has a defined plan that allows operators to roll out new code to
|
||||
subsets of services, eliminating the need to restart all services on new code
|
||||
simultaneously.
|
||||
|
||||
In order to assert the ``assert:supports-zero-downtime-upgrade`` tag, Glance
|
||||
must completely eliminate API downtime of the control plane during the upgrade.
|
||||
A key issue for Glance in this regard is how to handle database changes
|
||||
required for release N while release N-1 code is still running. We outline a
|
||||
strategy by which this may be accomplished below.
|
||||
|
||||
.. note::
|
||||
In what follows, we make the assumption that an operator interested
|
||||
in rolling upgrades will meet us halfway, that is, will be using an
|
||||
up-to-date version of the underlying DBMS that supports online schema
|
||||
changes that allow as much concurrency as possible.
|
||||
|
||||
|
||||
Proposed change
|
||||
===============
|
||||
|
||||
We propose an expand and contract strategy to implement database changes
|
||||
in such a way that a rolling upgrade may be accomplished within the confines
|
||||
of a single release. Some OpenStack services, such as Cinder, that have
|
||||
addressed this problem have chosen to make database changes over a sequence of
|
||||
releases, but we believe that given the structure of Glance and typical usage
|
||||
patterns, database changes can be made and finalized within a single release.
|
||||
Such an approach is preferable for an open source project in which the cast of
|
||||
characters may change considerably from cycle to cycle.
|
||||
|
||||
We first present an overview of the upgrade strategy and then provide a
|
||||
detailed example of how this will work for a change that will be occurring in
|
||||
the Ocata release.
|
||||
|
||||
Overview
|
||||
--------
|
||||
|
||||
The following diagram depicts a typical upgrade of an OpenStack service. The
|
||||
older services are shutdown completely (mostly during a maintenance window),
|
||||
the new code is deployed and finally the new services are started. Obviously,
|
||||
this involves some downtime for the users. To minimize/eliminate downtime, the
|
||||
services can be upgraded in a rolling fashion, that is, upgrading few services
|
||||
at a time. This results in a situation where both old (say N-1) and new (say N)
|
||||
services must co-exist for a certain period of time. In a straightforward
|
||||
upgrade where the new services have no database changes associated with them,
|
||||
the services can co-exist right from the onset as both rely on the same schema.
|
||||
|
||||
.. |.| unicode:: U+200B .. zero-width space not considered whitespace
|
||||
|
||||
.. parsed-literal::
|
||||
|
||||
|.| | | |
|
||||
|.| | | |
|
||||
|.| | | |
|
||||
|.| -----------------------+ | | | +---------------------
|
||||
|.| | | Deploy N | |
|
||||
|.| N-1 | | (upgrade code | | N
|
||||
|.| | | and/or config | |
|
||||
|.| -----------------------+ | and migrate db) | +---------------------
|
||||
|.| | | |
|
||||
|.| Stop N-1 | Start N
|
||||
|.| Services | Services
|
||||
|.| | | |
|
||||
|.| | | |
|
||||
|.| | | |
|
||||
|.| | | |
|
||||
|.| | | |
|
||||
|.| | | |
|
||||
|.|
|
||||
|.| <---------------->
|
||||
|.| Downtime
|
||||
|.| <---------------->
|
||||
|
||||
However, in the presence of database changes it isn't yet possible for the
|
||||
services to co-exist. The primary reason is the way we do database
|
||||
changes/migrations currently. A typical migration in Glance is an atomic change
|
||||
that includes both schema and corresponding data migrations together.
|
||||
While the schema migrations perform necessary additions/removals/modifications
|
||||
to the schema, data migrations perform corresponding changes to the data.
|
||||
This approach at times, depending on the nature of schema changes, is
|
||||
backwards-incompatible. That is, older services may not be able to run with new
|
||||
schema. This essentially limits the ability for old and new services to
|
||||
co-exist and consequently prohibits rolling upgrades.
|
||||
|
||||
To achieve rolling upgrades, database migrations need to be done in such a way
|
||||
that both old and new services can co-exist over a period of time. A well known
|
||||
strategy is to re-imagine database changes in ``expand and contract`` style
|
||||
instead of one atomic change. With the expand and contract style, we achieve
|
||||
the desired schema changes in two distinct steps:
|
||||
|
||||
* **Expand**: In the ``expand`` step, we make ``only additive changes``
|
||||
that are required by the new services. This keeps the schema intact for
|
||||
older services to run along with the new services. The typical schema
|
||||
changes that fall into this category are adding columns and tables.
|
||||
|
||||
An exception to this additive-only change strategy is that it may
|
||||
be necessary to remove some constraints in order to allow database
|
||||
triggers (discussed below) to work.
|
||||
|
||||
* **Contract**: All the other changes, that is ``non-additive changes``,
|
||||
are grouped into ``contract`` step. Changes like removing a column, table
|
||||
and/or constraints are made in this step.
|
||||
|
||||
Additionally, if any constraints were removed during the expand
|
||||
step, they are restored during the contract phase. Any database
|
||||
triggers installed during the expand phase are also removed at this
|
||||
point.
|
||||
|
||||
This breakup gives us the ability to perform the minimum required changes
|
||||
first (while keeping schema compatibility with old services) and delay the
|
||||
other changes until a later point in time. Therefore, we always first expand
|
||||
the database in order to start a rolling upgrade while the old services are
|
||||
still running. Once the database is expanded, the new columns and tables are
|
||||
created. However, they would be empty. At this point, we should start migrating
|
||||
the data over to the new column. But, at the same time, it is important to
|
||||
keep the new and old columns in sync. Any writes to old column must be sync-ed
|
||||
to the new column. And, vice-versa (although we don't write to the new column
|
||||
yet, we have to keep the old column in sync when the new services come up and
|
||||
start writing to the new column while the services co-exist). We use **database
|
||||
triggers** to keep the columns in sync.
|
||||
|
||||
We add the triggers to the database along with the additive changes
|
||||
during the database expand. At this point, we start migrating the data over to
|
||||
the new column. However, because the old services are live at this point, we
|
||||
migrate the data in small batches to avoid excessive load on the database and
|
||||
thereby any interruption to the old services. These migrations can be scheduled
|
||||
to run during low-traffic hours to minimize impact on older services. Once the
|
||||
data migrations finish, the new column is populated and ready for use, we start
|
||||
deploying the new services.
|
||||
|
||||
We deploy services in small batches by taking some nodes out of rotation,
|
||||
wait for them to drain connections, upgrade the services and put the nodes back
|
||||
into rotation. It is during this period that old and new services co-exist.
|
||||
When the new services come up, they start reading from and writing to the new
|
||||
column. Any data written to the new column is synced over to the old column (by
|
||||
the triggers added during database expand) and available for older services to
|
||||
consume. Once all the older services are upgraded, it is now safe to contract
|
||||
the database. This ensures that we reach the desired state of database schema.
|
||||
We also drop the database triggers during the database contract because
|
||||
the old column would cease to exist and only the new column would be in use.
|
||||
|
||||
|
||||
.. parsed-literal::
|
||||
|
||||
|.| ---------------------------------------+
|
||||
|.| |
|
||||
|.| N-1 |
|
||||
|.| |
|
||||
|.| ---------------------------------------+
|
||||
|.|
|
||||
|.| | | | | | |
|
||||
|.| | | Finish | | |
|
||||
|.| | | Data |
|
||||
|.| Expand | Migrations| +----------------------------
|
||||
|.| Database | | | |
|
||||
|.| & | | | | N
|
||||
|.| Add | | | |
|
||||
|.| Triggers| | | +----------------------------
|
||||
|.| | | | |
|
||||
|.| | | | Start N | |
|
||||
|.| | Start | Deploy | Contract
|
||||
|.| | Data | | | Database
|
||||
|.| | Migrations | | | &
|
||||
|.| | | | | | Drop
|
||||
|.| | | | | | Triggers
|
||||
|.| | | | | Finish N |
|
||||
|.| | | | | Deploy |
|
||||
|.| | | | | | |
|
||||
|.| | | | | | |
|
||||
|
||||
|
||||
To summarize, as shown in the above diagram, we split the database migrations
|
||||
into schema and data migrations. The schema migrations can be additive or
|
||||
contractive in nature, or a combination of both. Additive schema migrations are
|
||||
run before the upgrade begins to prepare the database for new services while it
|
||||
is still usable by old services. (This phase is also called "database
|
||||
expand".) During database expand, we also add triggers on old and new columns
|
||||
to keep them in sync. Once the database is expanded, we start migrating the
|
||||
data over to the new column in small batches. When the data migrations are
|
||||
complete, we upgrade the old services in a rolling fashion. Once all the old
|
||||
services are upgraded, we run the contractive migrations on the database.
|
||||
(This phase is also called "database contract".) The triggers are also dropped
|
||||
during database contract.
|
||||
|
||||
In addition to the description of the process given above, here are a few
|
||||
constraints on how upgrades will work:
|
||||
|
||||
* A typical upgrade is complete only when the entire expand-migrate-contract
|
||||
cycle for a release is performed. We do *not* propose to support an N-1 to
|
||||
N upgrade while an N-2 to N-1 upgrade is in progress.
|
||||
|
||||
* "Leapfrogging" releases (that is, allowing a direct N-2 to N upgrade,
|
||||
skipping N-1) is *not* supported.
|
||||
|
||||
* It's possible that in a single release there may be multiple features, worked
|
||||
on independently by different developers, that will require some kind of
|
||||
database modification. What we are proposing in this spec is that for each
|
||||
release, there will be a *single* expand-migrate-contract operation from the
|
||||
operator's point of view. In other words, all feature teams will have to
|
||||
coordinate so that all expands are performed, followed by all migrations, and
|
||||
concluding with all contractions. This will be easy for features whose
|
||||
changes are completely independent, but may be more difficult for others.
|
||||
However, preserving zero-downtime database changes will be a Glance project
|
||||
priority once this spec has been approved, so such interactions will be
|
||||
addressed on the specs for features.
|
||||
|
||||
.. note:: The current Glance spec template asks this question in the "Data
|
||||
model impact" section:
|
||||
|
||||
* What database migrations will accompany this change?
|
||||
|
||||
This should be modified along the following lines. (Note: this is
|
||||
only a suggestion, we can argue about the best wording on the patch
|
||||
that modifies the spec template.)
|
||||
|
||||
* Glance is committed to zero-downtime database migrations.
|
||||
Explain what database migrations will accompany this change.
|
||||
Do they have the potential to interfere with the database
|
||||
migrations for other specs that have been approved for this
|
||||
cycle?
|
||||
|
||||
Keep in mind that our goal here is to achieve the upgrade tags. While it's
|
||||
not *prohibited* to exceed them, they do specify a baseline for achievement
|
||||
that's been adopted by the OpenStack community. Hence simply meeting the
|
||||
requirements for the tags is a worthwhile goal.
|
||||
|
||||
Steps
|
||||
-----
|
||||
|
||||
Let's look at a rolling-upgrade strategy for Glance in more detail. Consider
|
||||
the case where a database change is made such that data stored in
|
||||
"the old column" in release N-1 will be stored in "the new column" in
|
||||
release N. The following are steps that we take to achieve rolling-upgrade.
|
||||
|
||||
Expand Database
|
||||
^^^^^^^^^^^^^^^
|
||||
|
||||
Goal: Prepare database for N by expanding the database
|
||||
|
||||
As shown in the below diagram, initially, we have N-1 reading from and writing
|
||||
to the old column. We then expand the schema for N which introduces the new
|
||||
column while N-1 is still running. This should have minimal to no impact on N-1
|
||||
services.
|
||||
|
||||
.. note:: It is important to note that while database expand operations are
|
||||
required to be strictly additive in nature, adding constraints can
|
||||
sometimes be disruptive as they are known to lock the table. This is
|
||||
alleviated by online DDL capabilities in MySQL 5.6 for InnoDB. So, simple
|
||||
changes may not be a concern. (In any case, the plan proposed in this spec
|
||||
adds constraints during the contract phase only.)
|
||||
|
||||
.. parsed-literal::
|
||||
|
||||
|.| -----------------------------------------------------------
|
||||
|.|
|
||||
|.| N-1
|
||||
|.|
|
||||
|.| -------+-----------------------+---------------------------
|
||||
|.| | |
|
||||
|.| | | | |
|
||||
|.| Read/Write | Read/Write |
|
||||
|.| | Expand N | |
|
||||
|.| | & | Start
|
||||
|.| +----v-----+ Add +----v-----+----------+ Data
|
||||
|.| | Old | Triggers | Old | New | Migrations
|
||||
|.| +----------+ | +---------------------+ |
|
||||
|.| | | | | | | |
|
||||
|.| | | | | | | |
|
||||
|.| | | | | | | |
|
||||
|.| | | | | | | |
|
||||
|.| | | | | | | |
|
||||
|.| | | | | | | |
|
||||
|.| | | | | | | |
|
||||
|.| | | | | | | |
|
||||
|.| | | | | | | |
|
||||
|.| | | | | | | |
|
||||
|.| +----------+ | +----------+----------+ |
|
||||
|.| | ^ ^ |
|
||||
|.| | | Triggers | |
|
||||
|.| | +-------------+ |
|
||||
|.| | |
|
||||
|.| | <--------------------------------- > |
|
||||
|.| | Expand Database |
|
||||
|.| | <--------------------------------- > |
|
||||
|
||||
|
||||
|
||||
While expanding the database, we also add triggers that keep the old and new
|
||||
columns in sync.
|
||||
|
||||
Deliverable: We propose to make this available by extending the glance-manage
|
||||
utility with an expand command. The database could be expanded by running
|
||||
``glance-manage db expand``.
|
||||
|
||||
|
||||
Migrate Data
|
||||
^^^^^^^^^^^^
|
||||
|
||||
Goal: Populate the new column(s) for N to use
|
||||
|
||||
At this point, only release N code is running and it continues to read from and
|
||||
write to the old column as shown in the below diagram. All writes made by N-1
|
||||
to the old column are synced with the new column. While the triggers slowly
|
||||
start populating the new column, we commence the background data migrations to
|
||||
populate data into the new column in a non-intrusive manner.
|
||||
|
||||
.. parsed-literal::
|
||||
|
||||
|.| -------------------------------------------------
|
||||
|.|
|
||||
|.| N-1
|
||||
|.|
|
||||
|.| -----------------+-------------------------------
|
||||
|.| |
|
||||
|.| | | |
|
||||
|.| | Read/Write |
|
||||
|.| | | |
|
||||
|.| Start | Finish
|
||||
|.| Data +----v-----+----------+ Data
|
||||
|.| Migrations | Old | New | Migrations
|
||||
|.| | +---------------------+ |
|
||||
|.| | | | | |
|
||||
|.| | | | | |
|
||||
|.| | | | | |
|
||||
|.| | | | | |
|
||||
|.| | | | | |
|
||||
|.| | | | | |
|
||||
|.| | | | | |
|
||||
|.| | | | | |
|
||||
|.| | | | | |
|
||||
|.| | | | | |
|
||||
|.| | +----------+----------+ |
|
||||
|.| | ^ ^ |
|
||||
|.| | | Triggers | |
|
||||
|.| | +-------------+ |
|
||||
|.| | |
|
||||
|.| | <--------------------------------- > |
|
||||
|.| | Migrate Data |
|
||||
|.| | <--------------------------------- > |
|
||||
|
||||
|
||||
Deliverable: We propose to extend the glance-manage utility to migrate the data
|
||||
in batches. The batch size could be controlled with an optional parameter, for
|
||||
example, ``max_rows``. The parameter would allow operators to schedule
|
||||
migrations of no more than N rows at a time, in case they have a large database
|
||||
and want to run the migration only during off-peak times. Without the optional
|
||||
parameter, all rows would be migrated. The utility will return an appropriate
|
||||
response if it's run and it finds that there are no rows that need to be
|
||||
migrated.
|
||||
|
||||
For example: ``glance-manage db migrate --max_rows=10``.
|
||||
|
||||
|
||||
Deploy
|
||||
^^^^^^
|
||||
|
||||
Goal: Deploy N by upgrading N-1 in a rolling fashion and have both versions
|
||||
co-exist during the deploy
|
||||
|
||||
As the new column is now ready to use, we start deploying N in small batches.
|
||||
Release N-1 has no idea that an upgrade is occurring, but the release N code is
|
||||
co-existing with N-1 services as shown in the below diagram. While N-1 and N
|
||||
services are using the old and new column respectively, the triggers are
|
||||
keeping the two columns in sync whenever there is a database write. This
|
||||
enables N to see the updates made by N-1 and vice-versa.
|
||||
|
||||
.. parsed-literal::
|
||||
|
||||
|.| ------------------------------------+
|
||||
|.| |
|
||||
|.| N-1 |
|
||||
|.| |
|
||||
|.| --------------+---------------------+ |
|
||||
|.| | |
|
||||
|.| | |
|
||||
|.| | | +------------------------------
|
||||
|.| | | |
|
||||
|.| | | | N
|
||||
|.| | | |
|
||||
|.| | | +-------+----------------------
|
||||
|.| | | |
|
||||
|.| | Read/ Read/ |
|
||||
|.| | Write Write |
|
||||
|.| | | | |
|
||||
|.| | | | |
|
||||
|.| | +---v------+----v-----+ Finish N
|
||||
|.| | | Old | New | Deploy
|
||||
|.| Start N +---------------------+ |
|
||||
|.| Deploy | | | |
|
||||
|.| | | | | |
|
||||
|.| | | | | |
|
||||
|.| | | | | |
|
||||
|.| | | | | |
|
||||
|.| | | | | |
|
||||
|.| | | | | |
|
||||
|.| | | | | |
|
||||
|.| | | | | |
|
||||
|.| | | | | |
|
||||
|.| | +----------+----------+ |
|
||||
|.| | ^ ^ |
|
||||
|.| | | Triggers | |
|
||||
|.| | +-------------+ |
|
||||
|.| | |
|
||||
|.| | |
|
||||
|.| | <----------------------------> |
|
||||
|.| | Deploy |
|
||||
|.| | <----------------------------> |
|
||||
|.| | |
|
||||
|.|
|
||||
|
||||
.. note::
|
||||
As the N-1 and N services co-exist, users may notice inconsistent behavior
|
||||
in certain situations. Typically, a new release is backwards-compatible
|
||||
with the previous release. As such, all requests should exhibit similar
|
||||
behavior across both versions. However, some changes to the API (for
|
||||
example: bug fixes) may result in different behavior across two releases.
|
||||
So, a user may witness different responses to similar requests depending
|
||||
upon which service processes the request.
|
||||
|
||||
Similarly, user requests for new features introduced with the new version,
|
||||
may fail when they are processed by an older service. While this
|
||||
inconsistency is not desirable, it could be seen as a decent compromise
|
||||
over incurring downtime during the upgrade.
|
||||
|
||||
Contract Database
|
||||
^^^^^^^^^^^^^^^^^
|
||||
|
||||
Goal: Complete the schema migrations desired in N
|
||||
|
||||
When all the services are upgraded, the old column is unused. The new column
|
||||
would be the source of truth henceforth. The old column is ready for removal.
|
||||
At this point, we contract the database, which drops the old column and
|
||||
triggers added during database expand.
|
||||
|
||||
.. parsed-literal::
|
||||
|
||||
|.| |
|
||||
|.| |
|
||||
|.|
|
||||
|.| -------------------------------------------
|
||||
|.|
|
||||
|.| N
|
||||
|.|
|
||||
|.| -----------------------+-------------------
|
||||
|.| |
|
||||
|.| | Read/
|
||||
|.| | Write
|
||||
|.| | |
|
||||
|.| | |
|
||||
|.| Contract +---v----+
|
||||
|.| Database | New |
|
||||
|.| & +--------+
|
||||
|.| Drop | |
|
||||
|.| Triggers | |
|
||||
|.| | | |
|
||||
|.| | | |
|
||||
|.| | | |
|
||||
|.| | | |
|
||||
|.| | | |
|
||||
|.| | | |
|
||||
|.| | | |
|
||||
|.| | | |
|
||||
|.| | ---------+
|
||||
|.| |
|
||||
|.| |
|
||||
|.| | <----------------------->
|
||||
|.| | Contract Database
|
||||
|.| | <----------------------->
|
||||
|.| |
|
||||
|
||||
.. note::
|
||||
In addition to removing the unused columns and tables, SQL constraints such
|
||||
as nullability, unique and default must be set here.
|
||||
|
||||
Deliverable: We propose to make this available by extending the glance-manage
|
||||
utility with a contract command. The database could be contracted by running
|
||||
``glance-manage db contract``.
|
||||
|
||||
|
||||
Rolling Upgrade Process for Operators
|
||||
-------------------------------------
|
||||
|
||||
Following is the process to upgrade Glance with zero downtime:
|
||||
|
||||
1. Backup Glance database.
|
||||
|
||||
2. Choose an arbitrary Glance node or provision a new node to install the new
|
||||
release. If an existing Glance node is chosen, gracefully stop the Glance
|
||||
services.
|
||||
|
||||
3. Upgrade the above chosen node with new release and update the configuration
|
||||
accordingly. However, Glance services MUST NOT be started just yet.
|
||||
|
||||
4. Using the upgraded node, expand the database using the command
|
||||
``glance-manage db expand``.
|
||||
|
||||
5. Then, schedule the data migrations using the command
|
||||
``glance-manage db migrate --max_rows=<max. row count>``.
|
||||
|
||||
Data migrations must be scheduled to run until no more rows are left to
|
||||
migrate.
|
||||
|
||||
6. Start the Glance processes on the first node.
|
||||
|
||||
7. Taking one node at a time from the remaining nodes, stop the Glance
|
||||
processes, upgrade to the new release (and corresponding configuration) and
|
||||
start the Glance processes.
|
||||
|
||||
.. note::
|
||||
Before stopping the Glance processes on a node, one may choose to wait
|
||||
until all the existing connections drain out. This could be achieved by
|
||||
taking the node out of rotation. This way all the requests that are
|
||||
currently being processed will get a chance to finish processing.
|
||||
However, some Glance requests like uploading and downloading images
|
||||
may last a long time. This increases the wait time to drain out all
|
||||
connections and consequently the time to upgrade Glance completely.
|
||||
On the other hand, stopping the Glance services before the connections
|
||||
drain out will present the user with errors. This can at times be seen as
|
||||
downtime as well. Hence, an operator must be judicious when stopping the
|
||||
services.
|
||||
|
||||
8. Contract the database by running the command
|
||||
``glance manage db contract`` from any one of the nodes.
|
||||
|
||||
|
||||
Example
|
||||
-------
|
||||
|
||||
To understand how this would work in action, consider the following example of
|
||||
a Glance database change proposed for Ocata.
|
||||
|
||||
.. note:: This does not prescribe the actual Ocata database change. It is
|
||||
included here as a realistic example for a sanity check of this
|
||||
proposal.
|
||||
|
||||
The "old column": Newton (release N-1): boolean ``is_public`` column in images
|
||||
table. This column has nullable=False and default=False.
|
||||
|
||||
The "new column": Ocata (release N) : enum (or string ... key point is it's a
|
||||
different data type) ``visibility`` column in images table. This column can
|
||||
have one of the values 'public', 'private', 'shared', 'community'. After the
|
||||
database contraction has completed, this column would have
|
||||
nullable=False, and default='private'. (During the migrate and deploy phases,
|
||||
this column will probably have nullable=true with no default.)
|
||||
|
||||
Using the proposed strategy, the database upgrade would proceed as follows.
|
||||
|
||||
#. Pre-upgrade: Version N-1 code read/write to ``is_public``.
|
||||
|
||||
#. Expand Database: Add the ``visibility`` column and the appropriate triggers
|
||||
to keep the old and new values in sync.
|
||||
|
||||
#. Migrate Data: Crawl the 'images' table. For any row where
|
||||
``visibility`` is null, set the value for ``visibility`` as follows:
|
||||
|
||||
* If ``is_public`` is '1': set visibility to ``public``
|
||||
* If ``is_public`` is '0': if the image has any members, set visibility to
|
||||
``shared``; otherwise set visibility to ``private``
|
||||
|
||||
Migrate any data (using triggers) written by N-1 code to the old column
|
||||
using the above criteria.
|
||||
|
||||
#. Deploy: Deploy N code in a rolling fashion. N code will start using the
|
||||
``visibility`` column.
|
||||
|
||||
Here's an analysis of database activity.
|
||||
|
||||
* Write operations
|
||||
|
||||
* The v1 API
|
||||
|
||||
* nothing to worry about, has no concept of ``visibility``
|
||||
|
||||
* The v2 API
|
||||
|
||||
#. ``visibility`` set to ``public``
|
||||
|
||||
* N-1: will put '1' in ``is_public``
|
||||
* Triggers will put 'public' in ``visibility``
|
||||
* N: will put 'public' in ``visibility``
|
||||
* Triggers will put '1' in ``is_public``
|
||||
|
||||
#. ``visibility`` set to ``private``
|
||||
|
||||
* N-1: will put '0' in ``is_public``
|
||||
* Triggers will put 'private' in ``visibility``
|
||||
* N: will put 'private' in ``visibility``
|
||||
* Triggers will put '0' in ``is_public``
|
||||
|
||||
#. ``visibility`` set to ``community``
|
||||
|
||||
* N-1: call will fail at API level, will never hit the database
|
||||
* N: will put 'community' in ``visibility``
|
||||
* Triggers will put '0' in ``is_public``
|
||||
|
||||
.. note::
|
||||
This essentially means that a community image will be considered
|
||||
as private image by N-1. Thus, barring the owner, a community
|
||||
image won't be visible to any one. Since N-1 has no notion of
|
||||
community images, this behavior can be seen as consistent with
|
||||
respect to N-1. However, it may be confusing the owner of the
|
||||
community image for whom the image will appear as community with
|
||||
N and private with N-1. Thus, the owner may try to change the
|
||||
visibility again. To discourage this, we may prohibit any writes
|
||||
to the ``is_public`` column when it has '0' and ``visibility``
|
||||
column has ``community``. This could be done again by using the
|
||||
same triggers that we added during database expand. The first
|
||||
alternative mentioned in the alternatives section avoids this
|
||||
situation.
|
||||
|
||||
#. ``visibility`` set to ``shared``
|
||||
|
||||
* N-1: call will fail at API level, will never hit the database
|
||||
* N: will write 'shared' in ``visibility``
|
||||
|
||||
* Triggers will write '0' in ``is_public``; this will allow image
|
||||
sharing to continue to work properly on the release N-1 nodes as
|
||||
well as the v1 API on all nodes.
|
||||
|
||||
* Read operations
|
||||
|
||||
* Read operations across API versions and releases should remain
|
||||
unaffected as the triggers keep both old and new columns in sync by
|
||||
translating the data appropriately.
|
||||
|
||||
#. Contract Database: The only API nodes running are version N.
|
||||
The ``is_public`` column is no longer in use. Drop ``is_public`` and add
|
||||
nullable=True and default=private on ``visibility`` column.
|
||||
|
||||
|
||||
Alternatives
|
||||
------------
|
||||
|
||||
1. This is a small variant of the above described strategy. The fundamental
|
||||
idea behind the above described strategy is: When both versions co-exist,
|
||||
sync the writes made by one set of services to be available for the others
|
||||
to consume. We achieve this using triggers. On the other hand, what if we
|
||||
eliminate the need to sync? That is, what if we disallow any writes to both
|
||||
old and the new columns while the services co-exist? This can be achieved by
|
||||
using triggers again. Essentially, the triggers we add during the database
|
||||
expand step will intercept and disallow writes to the old and new columns.
|
||||
|
||||
For the above given example, all requests attempting to change the
|
||||
visibility of image will fail for the duration of deploy step where the
|
||||
services co-exist. Reads would be permitted, however. Once the deploy is
|
||||
finished and we contract the database (the triggers are dropped here),
|
||||
writes to new column would be permitted as usual. This gives us a way to
|
||||
eliminate the need for syncing data across columns. Consequently, there is
|
||||
much less complexity in the triggers and the upgrade is less error-prone.
|
||||
However, it is important to note that one may see an increased error rate
|
||||
during the deploy due to disallowed writes. Although the API will be
|
||||
responsive throughout this entire period (and hence "up"), the increased
|
||||
rate of 5xx responses will make it impossible to assert the
|
||||
``assert:zero-downtime-upgrade`` tag [GVV2]_. Since being able to assert
|
||||
this tag is the aim of this spec, this alternative is not acceptable.
|
||||
|
||||
2. A well known alternative replaces the use of triggers by migrating the data
|
||||
online from within the application. While the triggers approach migrates the
|
||||
data online on a database write operation, the other approach attempts to
|
||||
migrate the data on an on-demand basis in the event of a database read
|
||||
operation.
|
||||
|
||||
Approaches taken by other Openstack Projects:
|
||||
|
||||
Nova: See [NOV1]_.
|
||||
|
||||
Cinder: See [CIN1]_.
|
||||
|
||||
Keystone: See [KEY1]_.
|
||||
|
||||
Neutron: See [NEU1]_, [NEU2]_.
|
||||
|
||||
Data model impact
|
||||
-----------------
|
||||
|
||||
None
|
||||
|
||||
REST API impact
|
||||
---------------
|
||||
|
||||
There would be no impact to REST API contracts as such.
|
||||
|
||||
Security impact
|
||||
---------------
|
||||
|
||||
None
|
||||
|
||||
Notifications impact
|
||||
--------------------
|
||||
|
||||
None
|
||||
|
||||
Other end user impact
|
||||
---------------------
|
||||
|
||||
None
|
||||
|
||||
Performance Impact
|
||||
------------------
|
||||
|
||||
The background data migration will consume extra database resources, but this
|
||||
can be managed if the migration script is carefully written.
|
||||
|
||||
Other deployer impact
|
||||
---------------------
|
||||
|
||||
* Deployers who intend to deploy Glance the old way, that is with downtime,
|
||||
remain unaffected.
|
||||
* Each step of the migration requires operator intervention.
|
||||
|
||||
Developer impact
|
||||
----------------
|
||||
|
||||
Any developer working on a feature that requires database changes must write
|
||||
additional code to support the rolling upgrade strategy outlined in this
|
||||
document. By confining the database changes to a single release, however,
|
||||
developers of release N+1 do not have to worry about completing procedures
|
||||
begun during the migration of release N-1 to N.
|
||||
|
||||
Implementation
|
||||
==============
|
||||
|
||||
Assignee(s)
|
||||
-----------
|
||||
|
||||
Primary assignee:
|
||||
alex_bash
|
||||
hemanthm
|
||||
|
||||
Other contributors:
|
||||
nikhil
|
||||
|
||||
Work Items
|
||||
----------
|
||||
|
||||
* Write documentation for rolling upgrade (developer docs).
|
||||
|
||||
* Write documentation for rolling upgrade (operator docs).
|
||||
|
||||
* Introduce expand/contract migration streams and the corresponding
|
||||
glance-manage CLI.
|
||||
|
||||
* Work with the developers of Ocata features that require database changes
|
||||
to implement code to follow the rolling upgrade strategy. These include:
|
||||
|
||||
* community images and enhanced image sharing
|
||||
|
||||
* image import
|
||||
|
||||
Dependencies
|
||||
============
|
||||
|
||||
None
|
||||
|
||||
Testing
|
||||
=======
|
||||
|
||||
In order to assert the rolling upgrades tag, Glance must have full stack
|
||||
integration testing with a service arrangement that is representative of a
|
||||
meaningful-to-operators rolling upgrade scenario.
|
||||
|
||||
Ideally these tests will be able to simulate Glance running at scale, since, as
|
||||
discussed above, some DBMS problems may not be revealed in a small test
|
||||
database.
|
||||
|
||||
|
||||
Documentation Impact
|
||||
====================
|
||||
|
||||
* Developer documentation: the upgrade strategy.
|
||||
|
||||
* Operator documentation:
|
||||
|
||||
* configuration options for putting the code into the various modes
|
||||
* running the database scripts
|
||||
|
||||
References
|
||||
==========
|
||||
|
||||
.. [GVV1] https://governance.openstack.org/reference/tags/assert_supports-rolling-upgrade.html
|
||||
.. [GVV2] https://governance.openstack.org/reference/tags/assert_supports-zero-downtime-upgrade.html
|
||||
.. [GVV3] https://governance.openstack.org/reference/tags/assert_supports-zero-impact-upgrade.html
|
||||
.. [NOV1] http://www.danplanet.com/blog/2015/10/07/upgrades-in-nova-database-migrations/
|
||||
.. [CIN1] https://specs.openstack.org/openstack/cinder-specs/specs/mitaka/online-schema-upgrades.html
|
||||
.. [KEY1] https://specs.openstack.org/openstack/keystone-specs/specs/mitaka/online-schema-migration.html
|
||||
.. [NEU1] https://specs.openstack.org/openstack/neutron-specs/specs/liberty/online-schema-migrations.html
|
||||
.. [NEU2] http://docs.openstack.org/developer/neutron/devref/upgrade.html
|
Loading…
x
Reference in New Issue
Block a user