Glance Code Reviews
|
||||||
|
===================
|
||||||
|
|
||||||
|
Code reviews are a critical component of all OpenStack projects. Glance
|
||||||
|
accepts patches from many diverse people with diverse backgrounds,
|
||||||
|
employers, and experience levels. Code reviews provide a way to enforce a
|
||||||
|
level of consistency across the project, and also allow for the careful
|
||||||
|
on-boarding of contributions from new contributors.
|
||||||
|
|
||||||
|
Glance Spec Review Practices
|
||||||
|
~~~~~~~~~~~~~~~~~~~~~~~~~~~~
|
||||||
|
|
||||||
|
In addition to code reviews, Glance also maintains a BP specification git
|
||||||
|
repository. Detailed instructions for the use of this repository are provided
|
||||||
|
`here <https://opendev.org/openstack/glance-specs/src/branch/master/README.rst>`_.
|
||||||
|
It is expected that Glance core team members are actively reviewing
|
||||||
|
specifications which are pushed out for review to the specification repository.
|
||||||
|
Glance specs are approved/merged by the PTL only. The PTL can approve a spec
|
||||||
|
if it has a +2 from any two core reviewers.
|
||||||
|
|
||||||
|
Some guidelines around this process are provided below:
|
||||||
|
|
||||||
|
* Before approving a spec, the PTL or other core reviewers should confirm that
|
||||||
|
all the comments about the specification have been addressed.
|
||||||
|
* The PTL reserves the right to decide which specifications are important and
|
||||||
|
need to be approved for given cycle.
|
||||||
|
* All specifications should be approved within 1 week after milestone-1
|
||||||
|
release. Specifications which are not approved by then can be discussed in
|
||||||
|
the following weekly meeting and a decision will be made whether to grant an
|
||||||
|
FFE or move them to next cycle.
|
||||||
|
* The role of a core spec reviewer is to determine design fitness of the
|
||||||
|
proposed change, as well as suitability for inclusion in the project. In
|
||||||
|
order to do this, sufficient detail must be provided in the proposal, and
|
||||||
|
core reviewers should iterate with the author until a suitable amount of
|
||||||
|
information is included.
|
||||||
|
|
||||||
|
Guidelines for core reviewers
|
||||||
|
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
|
||||||
|
|
||||||
|
Glance follows the code review guidelines as set forth for all OpenStack
|
||||||
|
projects. It is expected that all reviewers are following the guidelines set
|
||||||
|
forth on that `page <https://docs.openstack.org/project-team-guide/review-the-openstack-way.html>`_.
|
||||||
|
In addition to that, the following rules are to be followed:
|
||||||
|
|
||||||
|
* Use of +W
|
||||||
|
|
||||||
|
* For a documentation change any core can ninja approve the patch if
|
||||||
|
everything is correct
|
||||||
|
* For a patch which fixes a bug, the approver should ensure that:
|
||||||
|
|
||||||
|
* Unit or Functional tests have been added/updated
|
||||||
|
* A release note has been added if the bug is not trivial
|
||||||
|
* The commit message is tagged with Closes-Bug: #bugid
|
||||||
|
|
||||||
|
* For a patch which adds/implements a new feature, the approver should
|
||||||
|
ensure that:
|
||||||
|
|
||||||
|
* Documentation is updated to explain how the new feature will work
|
||||||
|
* If an API call is added/modified, the API reference doc should be
|
||||||
|
updated accordingly
|
||||||
|
* Tempest/CI coverage is proposed/available for the new feature
|
||||||
|
* Client side changes are addressed if required
|
||||||
|
|
||||||
|
* Use of -2
|
||||||
|
|
||||||
|
* A -2 should be used to indicate that a patch or change cannot be allowed
|
||||||
|
to merge because of a fundamental conflict with the scope or goals of the
|
||||||
|
project. It should not be used in cases where the patch could be altered
|
||||||
|
to address feedback, or where further discussion is likely to lead to an
|
||||||
|
alternative implementation that would be suitable.
|
||||||
|
* A -2 review should always be accompanied by a comment explaining the reason
|
||||||
|
that the change does not fit with the project goals, so that the submitter
|
||||||
|
can understand the reasons and refocus their future contributions more
|
||||||
|
productively.
|
||||||
|
* The core team should come to an agreement if there is a difference of
|
||||||
|
opinion about the suitability of the patch.
|
||||||
|
* If a majority of the team is in favor of moving forward with the patch then
|
||||||
|
the person who added these -2(s) will change it to -1 if they still don't
|
||||||
|
agree with the implementation. As an open source team, we operate on
|
||||||
|
consensus of multiple people and do not support individual members acting
|
||||||
|
against the will of the others.
|
||||||
|
* The PTL reserves the right to ask a core reviewer to change their -2 vote
|
||||||
|
to a -1.
|
||||||
|
|
||||||
|
* Procedural use of -2
|
||||||
|
|
||||||
|
* In some situations, a core reviewer will put a -2 vote on a patch to "hold"
|
||||||
|
it temporarily from merging due to some procedural criteria. This may be
|
||||||
|
used on feature changes after Feature Freeze and before branching for the
|
||||||
|
next release, to ensure that no features are unintentionally merged during
|
||||||
|
the freeze.
|
||||||
|
* It may also be used to avoid merging something that depends on a
|
||||||
|
corresponding patch in another tree, or some job configuration change that
|
||||||
|
would otherwise result in a breakage if merged too soon. The person who
|
||||||
|
added these -2s will then remove them again once the blocking issue has
|
||||||
|
cleared.
|
||||||
|
* When placing the -2, they should leave a comment explaining exactly what is
|
||||||
|
happening, that the -2 is "procedural" and provide a timeline or criteria
|
||||||
|
after which the vote will be dropped. Submitters can continue to revise the
|
||||||
|
change during the freeze.
|
||||||
|
|
||||||
|
* Use of -W
|
||||||
|
|
||||||
|
* A Workflow -1 vote indicates that the change is not currently ready for a
|
||||||
|
comprehensive review and is intended for the original submitter to indicate
|
||||||
|
to reviewers that they do not expect the patch to be mergeable. Only core
|
||||||
|
reviewers and the original change owner can vote Workflow -1 on a given
|
||||||
|
patch. Any workflow votes are cleared when a new patch set is submitted
|
||||||
|
for the change. This is a better way to get feedback on ongoing work than
|
||||||
|
the legacy method of a Draft change (which is hidden from reviewers not
|
||||||
|
specifically added to it).
|
||||||
|
* Core reviewers may also use the Workflow -1 vote to prevent a change from
|
||||||
|
being merged during some temporary condition, without interrupting the
|
||||||
|
code-review process.
|
@ -16,6 +16,7 @@ Getting Started
|
|||||||
:maxdepth: 2
|
:maxdepth: 2
|
||||||
|
|
||||||
contributing
|
contributing
|
||||||
|
core_reviewer_guidelines
|
||||||
|
|
||||||
Development Policies
|
Development Policies
|
||||||
--------------------
|
--------------------
|
||||||
|
Loading…
x
Reference in New Issue
Block a user