Fix post-graduation expectation typo
Change-Id: Ic39ffeb75fe4470e05d28fcf7e0c3d491ad1f270
This commit is contained in:
@@ -109,7 +109,7 @@ requirements, including (but not limited to):
|
|||||||
|
|
||||||
= First Integrated Cycle Expectations =
|
= First Integrated Cycle Expectations =
|
||||||
|
|
||||||
In the release cyle after the project has graduated, the TC expects the project
|
In the release cycle after the project has graduated, the TC expects the project
|
||||||
to reach a level of maturity for its first integrated release. In order for the
|
to reach a level of maturity for its first integrated release. In order for the
|
||||||
project to graduate, the TC will need to be confident that the project will
|
project to graduate, the TC will need to be confident that the project will
|
||||||
reach that level of maturity in the time allowed.
|
reach that level of maturity in the time allowed.
|
||||||
|
|||||||
Reference in New Issue
Block a user