2022-02-10 Release Cadence Adjustment
|
||||||
|
=====================================
|
||||||
|
|
||||||
|
History
|
||||||
|
-------
|
||||||
|
|
||||||
|
Openstack has historically used a six month release cycle cadence for
|
||||||
|
the projects which participate in the coordinated release. Further,
|
||||||
|
upgrades were tested and supported between two adjacent coordinated
|
||||||
|
releases only, requiring deployers and distributions to either upgrade
|
||||||
|
every six months to stay current, or perform Fast Forward Upgrades
|
||||||
|
(FFUs) to move between non-adjacent releases at runtime. The latter is
|
||||||
|
an activity enabled by testing the individual upgrade steps, and is
|
||||||
|
not something we test specifically.
|
||||||
|
|
||||||
|
Challenges
|
||||||
|
----------
|
||||||
|
|
||||||
|
Some deployers and distributions have indicated that six month
|
||||||
|
upgrades are difficult, infeasible, or undesirable, especially in
|
||||||
|
large environments where the process itself takes long enough that
|
||||||
|
upgrades are constantly occurring. The FFU process can be laborious
|
||||||
|
and also requires running parts of a release that may have never been
|
||||||
|
deployed, productized, or tested in a given environment - purely
|
||||||
|
because each release must be used stepwise during the operation.
|
||||||
|
|
||||||
|
A number of opinions have been expressed about changing the release
|
||||||
|
cycle to either a slower (one year) or much slower (18 month) cadence
|
||||||
|
to address these concerns. The lack of consensus around what that
|
||||||
|
slower cadence should be makes it difficult to choose one that will be
|
||||||
|
beneficial, as one cycle length may cause people on a slower cycle to
|
||||||
|
need to wait much longer between upgrades. Further, community
|
||||||
|
involvement in a very long release can be difficult when attrition,
|
||||||
|
turnover, contract obligations and volunteer realities make slowing
|
||||||
|
down unpalatable in many cases. The community already struggles to
|
||||||
|
find candidates for six month (PTL) and one year (TC) duties. Further,
|
||||||
|
for environments that do need to move quickly, adopt new features and
|
||||||
|
deploy new technologies, double-digit months between landing a feature
|
||||||
|
and having it testable and usable in production is too long.
|
||||||
|
|
||||||
|
Proposed Solution
|
||||||
|
-----------------
|
||||||
|
|
||||||
|
It is very difficult to settle on any one change to the release
|
||||||
|
cadence that will address all of the above problems and concerns. As
|
||||||
|
such, the TC proposes an incremental change in release upgrade
|
||||||
|
expectations to help improve the slow-moving deployer experience,
|
||||||
|
without sacrificing the release-early-release-often goal.
|
||||||
|
|
||||||
|
The fundamental change comes to the expectation that upgrades are only
|
||||||
|
supported between adjacent coordinated releases. The TC will designate
|
||||||
|
major releases in a tick-tock arrangement, such that every other
|
||||||
|
release will be considered to be a "tick" release. Upgrades will be
|
||||||
|
supported between tick releases, in addition to between adjacent major
|
||||||
|
releases (as they are today). Deployments wishing to stay on the
|
||||||
|
six-month cycle will deploy every tick and tock release as they always
|
||||||
|
have. Deployments wishing to move to a one year upgrade cycle will
|
||||||
|
synchronize on a tick release, and then skip the following tock
|
||||||
|
release, upgrading when the subsequent tick is released.
|
||||||
|
|
||||||
|
Our letter-based release naming scheme is about to wrap back around to
|
||||||
|
A, so the proposal is that the "new A" release be the first one where
|
||||||
|
we enforce this scheme. Y->A should be a "dress rehearsal" where we
|
||||||
|
have the jobs enabled to help smoke out any issues, but where hard
|
||||||
|
guarantees are not yet made.
|
||||||
|
|
||||||
|
Occasionally, individual releases are chosen by a large number of
|
||||||
|
deployers and distributors by chance, which results in a larger than
|
||||||
|
normal community of maintainers that keep the release "alive" in
|
||||||
|
extended maintenance for longer. The expectation with this proposal is
|
||||||
|
that this will amplify that effect by increasing the likelihood that
|
||||||
|
"tick" releases will be chosen in this way and thus end up with more
|
||||||
|
focus on those releases for long-term community support.
|
||||||
|
|
||||||
|
Details
|
||||||
|
-------
|
||||||
|
|
||||||
|
#. **Testing**: Just as we test and guarantee that upgrades are
|
||||||
|
supported between adjacent releases today, we will *also* test and
|
||||||
|
guarantee that upgrades between two tick releases are supported.
|
||||||
|
Upgrades are tested for most projects today with grenade. A
|
||||||
|
skip-level job will be maintained in the grenade repository that
|
||||||
|
tests a normal configuration between the last two tick
|
||||||
|
releases. The job will be updated on every new tick release, and
|
||||||
|
there will always be a regular single-release grenade job testing
|
||||||
|
between the previous release and current one, as we have today.
|
||||||
|
#. **Tock upgrades**: Upgrades from tock to tock will not be tested
|
||||||
|
nor required. On a given tock release, the only upgrade path will
|
||||||
|
be to the following release (which would be a tick). This is
|
||||||
|
unchanged from today.
|
||||||
|
#. **Intervals**: Upgrades that span more than one tick cycle are not
|
||||||
|
tested or required. For example to move from tick A to tick E will
|
||||||
|
still require an FFU style arrangement, but where tick C is the
|
||||||
|
only intermediate step required.
|
||||||
|
#. **Deprecations**: Projects currently deprecate features and config
|
||||||
|
for at least one cycle before removal. This change affects *when*
|
||||||
|
that can happen, so that no required changes occur in a tock
|
||||||
|
release which may be skipped. Effectively the same rules that we
|
||||||
|
have today (both written and tribally-understood) apply to the new
|
||||||
|
arrangement, with the exception that "cycle" refers to a tick-tick
|
||||||
|
cycle and not a single pair of adjacent coordinated releases. Since
|
||||||
|
the deprecation, waiting, and removal can only happen in tick
|
||||||
|
releases, the result is also that the minimum *length* of time that
|
||||||
|
things may be deprecated before removal will increase as well.
|
||||||
|
#. **Support**: We will expect to support both the most recent tick
|
||||||
|
release as well as the one prior. During a tock release, that would
|
||||||
|
effectively be similar to what we support today, which is 18 months
|
||||||
|
of "maintained" releases. See the example sequence below.
|
||||||
|
#. **Rolling Upgrades**: This scheme does not necessarily dictate that
|
||||||
|
live or rolling upgrades need to be supported between tick
|
||||||
|
releases. Meaning RPC compatibility between N to N-1 guarantees can
|
||||||
|
remain, resulting in deployments that are on a tick-tick release
|
||||||
|
schedule requiring some downtime during an upgrade because
|
||||||
|
components will be spanning more than two actual releases.
|
||||||
|
#. **Data migrations**: Part of supporting tick-tick upgrades involves
|
||||||
|
keeping a stable (read "compatible" not "unchanging") database
|
||||||
|
schema from tick-tick. This includes data migrations which need to
|
||||||
|
do work in tick releases, and while they may do work in tock
|
||||||
|
releases, the work done in tock releases cannot be
|
||||||
|
*mandatory*. This can be solved by requiring operators to
|
||||||
|
(force-)complete data migrations on a source tick before upgrading
|
||||||
|
to a target tick, for example.
|
||||||
|
|
||||||
|
Example sequence
|
||||||
|
----------------
|
||||||
|
|
||||||
|
Assuming that A is the first release of this tick-tock arrangement,
|
||||||
|
the following examples help demonstrate the support lifecycle
|
||||||
|
expectation.
|
||||||
|
|
||||||
|
======= ==== ========= =======
|
||||||
|
Release Type Supported EM
|
||||||
|
A tick X,Y,Z W
|
||||||
|
B tock Y,Z,A W,X
|
||||||
|
C tick A,B,C W,X,Y,Z
|
||||||
|
D tock A,B,C,D X,Y,Z
|
||||||
|
E tick C,D,E Y,Z,A,B
|
||||||
|
F tock C,D,E,F Z,A,B
|
||||||
|
G tick E,F,G A,B,C
|
||||||
|
======= ==== ========= =======
|
||||||
|
|
||||||
|
(EM releases are arbitrarily pruned in the above example for brevity,
|
||||||
|
but no such change in how long they may be supported is made in this
|
||||||
|
resolution)
|
@ -7,6 +7,16 @@
|
|||||||
When a motion does not result in a change in a reference doc, it can
|
When a motion does not result in a change in a reference doc, it can
|
||||||
be expressed as a resolution.
|
be expressed as a resolution.
|
||||||
|
|
||||||
|
2022
|
||||||
|
====
|
||||||
|
|
||||||
|
.. toctree::
|
||||||
|
:maxdepth: 1
|
||||||
|
:glob:
|
||||||
|
:reversed:
|
||||||
|
|
||||||
|
2022*
|
||||||
|
|
||||||
2021
|
2021
|
||||||
====
|
====
|
||||||
|
|
||||||
|
Loading…
Reference in New Issue
Block a user