From f82667e8eb87d856622284ceb69c1410c8620d30 Mon Sep 17 00:00:00 2001 From: Kevin Benton Date: Tue, 14 Mar 2017 16:57:33 -0700 Subject: [PATCH] Trim rally scenario sizes During a normal run, the top three scenarios account for slightly more than a half hour of runtime. Sample numbers: Scenario Load Duration Full Duration NeutronNetworks.create_and_update_subnets 562.189 1,182.400 NeutronTrunks.create_and_list_trunk_subports 427.475 600.721 NeutronNetworks.create_and_list_ports 310.167 540.144 This patch reduces the resources created by each of the 3 by 75%. This should save us an additional ~20 minutes during a normal gate run, which should change our window for timeout from approximately a half hour on a normal node to about 50 minutes. This additional buffer should hopefully be enough to reduce the failure rate for the rally job when it gets scheduled to a slow node. Change-Id: I923b625f7dd3ebf794b6a9e097f5ed12ce446bb5 --- rally-jobs/neutron-neutron.yaml | 6 +++--- 1 file changed, 3 insertions(+), 3 deletions(-) diff --git a/rally-jobs/neutron-neutron.yaml b/rally-jobs/neutron-neutron.yaml index 79040d738c5..b911b10ca66 100644 --- a/rally-jobs/neutron-neutron.yaml +++ b/rally-jobs/neutron-neutron.yaml @@ -73,7 +73,7 @@ args: network_create_args: port_create_args: - ports_per_network: 100 + ports_per_network: 50 runner: type: "constant" times: 8 @@ -130,7 +130,7 @@ name: "_subnet_updated" runner: type: "constant" - times: 400 + times: 100 concurrency: 20 context: users: @@ -308,7 +308,7 @@ NeutronTrunks.create_and_list_trunk_subports: - args: - subport_count: 500 + subport_count: 250 runner: type: "constant" times: 1