Add note to model changing task
As some deliverables don't really fit the cycle-with-rc model but released only once per cycle, the process would still suggest the model change. This patch adds a note that for such cases the model change is not a must. Change-Id: I3ae583dab2df800a40fbca449fd2e6f08425bd5a
This commit is contained in:
parent
4502c07289
commit
06d65d6001
@ -570,8 +570,18 @@ Between Milestone-2 and Milestone-3
|
||||
switch to the cycle-with-rc model, which is much more suitable for
|
||||
deliverables that are only released once per cycle.
|
||||
|
||||
Propose a release model change for all deliverables meeting that criteria.
|
||||
PTLs and release liaisons may decide to:
|
||||
.. note::
|
||||
|
||||
Not every deliverable meeting the above criteria should be encouraged
|
||||
to change release model. For example if there are very limited changes
|
||||
per cycle, a single release without RCs is probably OK. A team may
|
||||
also want to keep the possibility of releasing multiple times per
|
||||
cycle.
|
||||
|
||||
Deliverables possibly meeting the criteria should be reviewed during the
|
||||
release meeting, and a release model change should be proposed for all
|
||||
deliverables where it could make sense. PTLs and release liaisons may
|
||||
decide to:
|
||||
|
||||
- immediately release an intermediary release (and -1 the proposed change)
|
||||
- confirm the release model change (+1 the proposed change)
|
||||
|