Before PTG (after closing previous release)
|
||||
===========================================
|
||||
|
||||
1. Set up the release schedule for the newly opened cycle by creating
|
||||
#. Set up the release schedule for the newly opened cycle by creating
|
||||
the required pages in openstack/releases.
|
||||
|
||||
2. Update the link to the documentation on the newly opened cycle page
|
||||
#. Update the link to the documentation on the newly opened cycle page
|
||||
to point to the right place on docs.openstack.org.
|
||||
|
||||
3. Create the $series-relmgt-plan and $series-relmgt-tracking
|
||||
etherpads.
|
||||
#. Create the $series-relmgt-tracking etherpad using ``tools/list_weeks.py``.
|
||||
For example::
|
||||
|
||||
4. Use ``init-series`` to create stub deliverable files based on the
|
||||
tools/list_weeks.py t 2019-04-15 2019-10-16
|
||||
|
||||
#. Use ``init-series`` to create stub deliverable files based on the
|
||||
contents of the previous release.
|
||||
|
||||
Between Summit and Milestone-1
|
||||
==============================
|
||||
|
||||
1. Establish liaisons by having them update
|
||||
#. Establish liaisons by having them update
|
||||
https://wiki.openstack.org/wiki/CrossProjectLiaisons with their
|
||||
contact information.
|
||||
|
||||
2. Email PTLs directly one time to explain the use of the "[release]"
|
||||
#. Email PTLs directly one time to explain the use of the "[release][ptl]"
|
||||
email tag on the openstack-discuss list.
|
||||
|
||||
3. Encourage liaisons to ensure that their release model is set
|
||||
#. Encourage liaisons to ensure that their release model is set
|
||||
properly before the first milestone.
|
||||
|
||||
4. Start weekly countdown emails, sent on Thursday afternoon (US)
|
||||
or Friday morning (EU/APAC) with information needed about the
|
||||
#. Start weekly countdown emails, sent right after the team meeting,
|
||||
with information needed about the
|
||||
following week (deadlines, instructions, etc.).
|
||||
|
||||
5. The week before Milestone-1, include a reminder about completing
|
||||
#. The week before Milestone-1, include a reminder about completing
|
||||
the responses to community-wide goals in the countdown email.
|
||||
|
||||
Milestone-1
|
||||
===========
|
||||
|
||||
1. Generate release requests for all cycle-with-intermediary libraries
|
||||
#. Generate release requests for all cycle-with-intermediary libraries
|
||||
which had changes, but did not release since the previous release.
|
||||
That patch will be used as a base to communicate with the team:
|
||||
if a team wants to wait for a specific patch to make it to the library,
|
||||
someone from the team can -1 the patch to have it held, or update
|
||||
that patch with a different commit SHA.
|
||||
|
||||
2. Run tools/aclissues.py to detect potential leftovers in Gerrit ACLs
|
||||
allowing official deliverables to directly tag or branch without
|
||||
#. To catch if there are acl issues in newly created repositories,
|
||||
run tools/aclissues.py to detect potential leftovers in Gerrit ACLs
|
||||
allowing official deliverables to be directly tagged or branched without
|
||||
going through openstack/releases. You need to specify the location
|
||||
of up-to-date checkouts for the governance and the project-config
|
||||
repositories. For example::
|
||||
|
||||
tools/aclissues.py ../project-config ../governance
|
||||
|
||||
If the tool reports any violation, you can re-run it with ``--patch`` to
|
||||
generate needed changes in ../project-config to align ACLs with governance,
|
||||
and propose the changes for review.
|
||||
|
||||
Between Milestone-1 and Milestone-2
|
||||
===================================
|
||||
|
||||
@ -76,41 +83,54 @@ Between Milestone-1 and Milestone-2
|
||||
|
||||
#. Mention the upcoming MembershipFreeze deadline in the countdown emails.
|
||||
|
||||
#. Ahead of MembershipFreeze, run membership_freeze_test to check for
|
||||
#. Ahead of MembershipFreeze, run ``membership_freeze_test`` to check for
|
||||
any new deliverable in governance that has not been released yet::
|
||||
|
||||
tox -e membership_freeze_test -- $series ~/branches/governance/reference/projects.yaml
|
||||
|
||||
Those should either get a release management exception (see
|
||||
release-management key in the governance projects.yaml file) or an
|
||||
empty deliverable file should be added to the series so that we can
|
||||
properly track it. Leftovers are considered too young to be released
|
||||
in the next release and will be reconsidered at the next cycle.
|
||||
Those should either be tagged as a release management exception if they do
|
||||
not need to be released (see ``release-management`` key in the governance
|
||||
projects.yaml file) or an empty deliverable file should be added to the
|
||||
series so that we can properly track it. Leftovers are considered too young
|
||||
to be released in the next release and will be reconsidered at the next
|
||||
cycle.
|
||||
|
||||
Milestone-2
|
||||
===========
|
||||
|
||||
1. Generate release requests for all cycle-with-intermediary libraries
|
||||
#. Generate release requests for all cycle-with-intermediary libraries
|
||||
which had changes, but did not release since milestone-1.
|
||||
That patch will be used as a base to communicate with the team:
|
||||
if a team wants to wait for a specific patch to make it to the library,
|
||||
someone from the team can -1 the patch to have it held, or update
|
||||
that patch with a different commit SHA.
|
||||
|
||||
2. Run tools/aclissues.py to detect potential leftovers in Gerrit ACLs
|
||||
allowing official deliverables to directly tag or branch without
|
||||
#. To catch if there are acl issues in newly created repositories,
|
||||
run ``tools/aclissues.py`` to detect potential leftovers in Gerrit ACLs
|
||||
allowing official deliverables to be directly tagged or branched without
|
||||
going through openstack/releases. You need to specify the location
|
||||
of up-to-date checkouts for the governance and the project-config
|
||||
repositories. For example::
|
||||
|
||||
tools/aclissues.py ../project-config ../governance
|
||||
|
||||
If the tool reports any violation, you can re-run it with ``--patch`` to
|
||||
generate needed changes in ../project-config to align ACLs with governance,
|
||||
and propose the changes for review.
|
||||
|
||||
Between Milestone-2 and Milestone-3
|
||||
===================================
|
||||
|
||||
#. In the countdown email immediately after Milestone-2, include a
|
||||
reminder about the various freezes that happen around Milestone-3.
|
||||
|
||||
Remind PTLs a heads up to start thinking about what they might want to
|
||||
include in their deliverables file as cycle-highlights
|
||||
and that feature freeze is the deadline for them.
|
||||
|
||||
#. Check with the election team about whether the countdown email
|
||||
needs to include any updates about the election schedule.
|
||||
|
||||
#. For intermediary-released service projects that have not done a
|
||||
release by milestone-2, propose a change from cycle-with-intermediary
|
||||
to cycle-with-rc. Engage with PTLs and release liaisons to either
|
||||
@ -119,26 +139,31 @@ Between Milestone-2 and Milestone-3
|
||||
#. Two weeks before Milestone-3, include a reminder about the final
|
||||
library release freeze coming the week before Milestone-3.
|
||||
|
||||
1. Run the command from milestone-2 again to get a list of libraries::
|
||||
#. Run the command from milestone-2 again to get a list of libraries::
|
||||
|
||||
tools/list_library_unreleased_changes.sh
|
||||
|
||||
2. Include list of unreleased libraries in the email to increase visibility.
|
||||
#. Include list of unreleased libraries in the email to increase visibility.
|
||||
|
||||
#. Two weeks before Milestone-3, prepare other teams to the final release
|
||||
rush.
|
||||
|
||||
1. Ask the release liaisons for the affected teams to update the
|
||||
contents of their $project-stable-maint groups, as that group
|
||||
will control the stable/$series branch prior to release. They
|
||||
should reach out to the stable-maint-core group for additions.
|
||||
#. Ask the release liaisons for the affected teams to audit the
|
||||
contents of their ``$project-stable-maint`` groups, as that group
|
||||
will control the ``stable/$series`` branch prior to release. They
|
||||
should reach out to the ``stable-maint-core`` group for additions.
|
||||
|
||||
2. Notify the Infrastructure team to `generate an artifact signing key`_
|
||||
#. Include a reminder about the stable branch ACLs in the countdown email.
|
||||
|
||||
#. Notify the Infrastructure team to `generate an artifact signing key`_
|
||||
(but not replace the current one yet), and
|
||||
begin the attestation process.
|
||||
|
||||
.. _generate an artifact signing key: https://docs.openstack.org/infra/system-config/signing.html#generation
|
||||
|
||||
#. Include a reminder in the weekly countdown email reminding PTLs of the
|
||||
feature freeze deadline for cycle-highlights.
|
||||
|
||||
Final Library Release (week before Milestone-3)
|
||||
===============================================
|
||||
|
||||
@ -149,27 +174,25 @@ Final Library Release (week before Milestone-3)
|
||||
library, someone from the team can -1 the patch to have it held, or update
|
||||
that patch with a different commit SHA.
|
||||
|
||||
#. Release libraries as quickly as possible this week to ensure they
|
||||
are all done before the freeze. Consider relaxing the "not on
|
||||
Friday" release rule if absolutely necessary.
|
||||
.. note::
|
||||
|
||||
#. Remind liaisons to prepare releases for client libraries at
|
||||
Milestone-3.
|
||||
At this point, we want *all* changes in the deliverables, to ensure
|
||||
that we have CI configuration up to date when the stable branch
|
||||
is created later.
|
||||
|
||||
#. Release libraries as quickly as possible this week to ensure they
|
||||
are all done before the freeze.
|
||||
|
||||
#. Update the feature list and allowed stable branch names in
|
||||
devstack-gate for the new stable branch. For
|
||||
example, https://review.openstack.org/362435 and
|
||||
https://review.openstack.org/363084
|
||||
|
||||
#. Allow the stable/$series branch to be requested with each library final
|
||||
#. Allow the ``stable/$series`` branch to be requested with each library final
|
||||
release if they know they are ready. Do not require branching at this point
|
||||
in case of critical issues requiring another approved release past the
|
||||
freeze date.
|
||||
|
||||
#. For stable libraries that did not have any change merged over the
|
||||
cycle, create a stable branch from the last available release.
|
||||
|
||||
|
||||
Milestone-3
|
||||
===========
|
||||
|
||||
@ -179,11 +202,22 @@ Milestone-3
|
||||
to make it to the library, someone from the team can -1 the patch to have
|
||||
it held, or update that patch with a different commit SHA.
|
||||
|
||||
#. Freeze changes to ``openstack/requirements`` by applying -2 to all
|
||||
open patches. Ensure that reviewers do not approve changes created
|
||||
by the proposal bot.
|
||||
#. Evaluate any libraries that did not have any change merged over the
|
||||
cycle to see if it is time to `transition them to the independent release
|
||||
model <https://releases.openstack.org/reference/release_models.html#openstack-related-libraries>`__.
|
||||
|
||||
#. Allow the stable/$series branch to be requested with each client library
|
||||
If it is OK to transition them, move the deliverable file to the ``_independent`` directory.
|
||||
|
||||
If it is not OK to transition them, create a new stable branch from the latest release
|
||||
from the previous series.
|
||||
|
||||
#. Remind the requirements team to freeze changes to
|
||||
``openstack/requirements`` by applying -2 to all
|
||||
open patches. Ensure that reviewers do not approve changes created
|
||||
by the proposal bot, but do approve changes for new OpenStack deliverable
|
||||
releases.
|
||||
|
||||
#. Allow the ``stable/$series`` branch to be requested with each client library
|
||||
final release if they know they are ready. Do not require branching at this
|
||||
point in case of critical issues requiring another approved release past the
|
||||
freeze date.
|
||||
@ -191,6 +225,9 @@ Milestone-3
|
||||
#. Remind PTLs/liaisons that master should be frozen except for bug
|
||||
fixes and feature work with FFEs.
|
||||
|
||||
#. Email openstack-discuss list to remind PTLs that cycle-highlights are due
|
||||
this week so that they can be included in release marketing preparations.
|
||||
|
||||
#. Remind PTL/liaisons to start preparing "prelude" release notes as
|
||||
summaries of the content of the release so that those are merged
|
||||
before their first release candidate.
|
||||
@ -200,68 +237,53 @@ Milestone-3
|
||||
constraint or requirement changes will be held until after the freeze
|
||||
period.
|
||||
|
||||
#. Include a reminder about completing the responses to community-wide
|
||||
goals in the countdown email.
|
||||
.. note::
|
||||
|
||||
#. Run tools/aclissues.py to detect potential leftovers in Gerrit ACLs
|
||||
allowing official deliverables to directly tag or branch without
|
||||
going through openstack/releases. You need to specify the location
|
||||
of up-to-date checkouts for the governance and the project-config
|
||||
repositories. For example::
|
||||
|
||||
tools/aclissues.py ../project-config ../governance
|
||||
|
||||
#. Email openstack-discuss to give PTLs a heads up to start thinking about
|
||||
what they might want to include in their deliverables file as cycle-highlights
|
||||
and that RC1 is the deadline for them.
|
||||
Do not release libraries without a link to a message to openstack-discuss
|
||||
requesting a requirements FFE and an approval response from that team.
|
||||
|
||||
Between Milestone-3 and RC1
|
||||
===========================
|
||||
|
||||
#. Warn cycle-with-intermediary projects that have releases more than
|
||||
#. Warn cycle-with-intermediary services that have releases more than
|
||||
2 months old that we will use their existing release as a point for
|
||||
branching if they have not prepared a newer release by the final RC
|
||||
deadline.
|
||||
|
||||
#. Propose stable/$series branch creation for all client and non-client
|
||||
#. Propose ``stable/$series`` branch creation for all client and non-client
|
||||
libraries that had not requested it at freeze time. The following command
|
||||
may be used::
|
||||
|
||||
tox -e venv -- propose-library-branches --include-clients
|
||||
|
||||
#. Include a reminder in the weekly countdown email reminding PTLs of the
|
||||
RC1 deadline for cycle-highlights.
|
||||
|
||||
RC1 week
|
||||
========
|
||||
|
||||
#. Early in the week, generate RC1 release requests (including the
|
||||
stable/$series branch creation) for all cycle-with-rc deliverables.
|
||||
``stable/$series`` branch creation) for all cycle-with-rc deliverables.
|
||||
That patch will be used as a base to communicate with the team:
|
||||
if a team wants to wait for a specific patch to make it to the RC,
|
||||
someone from the team can -1 the patch to have it held, or update
|
||||
that patch with a different commit SHA.
|
||||
|
||||
#. Email openstack-discuss list to remind PTLs that cycle-highlights are due
|
||||
this week so that they can be included in release marketing preparations.
|
||||
|
||||
#. By the end of the week, ideally we would want a +1 from the PTL and/or
|
||||
release liaison to indicate approval. However we will consider the absence
|
||||
of -1 or otherwise negative feedback as an indicator that the automatically
|
||||
proposed patches can be approved at the end of the RC deadline week.
|
||||
|
||||
#. After the minimum set of projects used by devstack have been branched, the
|
||||
devstack branch can be created. Devstack doesn't push a tag at RC1 it is
|
||||
just branched off of HEAD
|
||||
#. After all the projects enabled in devstack by default have been branched,
|
||||
remind the QA PTL to create a branch in the devstack repository. Devstack
|
||||
doesn't push a tag at RC1 it is just branched off of HEAD.
|
||||
|
||||
#. After devstack is branched a grenade branch can be created. As with
|
||||
devstack it will branch from HEAD instead of a tag.
|
||||
#. After devstack is branched, remind the QA PTL to create a branch in the
|
||||
grenade repository. As with devstack, it will branch from HEAD instead of a
|
||||
tag.
|
||||
|
||||
#. Update the default branch for devstack in the new stable
|
||||
branch. For example, https://review.openstack.org/#/c/493208/
|
||||
#. Remind the QA PTL to update the default branch for devstack in the new
|
||||
stable branch. For example, https://review.opendev.org/#/c/493208/
|
||||
|
||||
#. Update the grenade settings in devstack-gate for the new branch. For
|
||||
example, https://review.openstack.org/362438.
|
||||
#. Remind the QA PTL to update the grenade settings in devstack-gate for the
|
||||
new branch. For example, https://review.opendev.org/362438.
|
||||
|
||||
.. note::
|
||||
|
||||
@ -272,20 +294,13 @@ RC1 week
|
||||
master->master instead of previous->master. At the end of Ocata
|
||||
this caused trouble for the Ironic team, for example.
|
||||
|
||||
#. For translations, create stable-$series versions in the Zanata
|
||||
translation server on https://translate.openstack.org for all
|
||||
projects that the translation team wants to handle. Create new
|
||||
translation-jobs-$series periodic jobs to import translations from
|
||||
the Zanata translation server and propose them to projects, add
|
||||
these jobs to all projects that have a stable-$series version.
|
||||
#. Remind the I18n PTL to update the translation tools for the new stable
|
||||
series.
|
||||
|
||||
Note this work is done by translation team.
|
||||
|
||||
#. After all cycle-with-rc projects have their branches
|
||||
created, someone from the requirements core team (preferably the
|
||||
requirements PTL) needs to propose an update the deliverable file to
|
||||
create the stable/$series branch for ``openstack/requirements``.
|
||||
Then announce that the requirements freeze is lifted from master.
|
||||
#. After all cycle-with-rc projects have their branches created, remind the
|
||||
requirements PTL to propose an update to the deliverable file to create the
|
||||
``stable/$series`` branch for ``openstack/requirements``. Then announce that
|
||||
the requirements freeze is lifted from master.
|
||||
|
||||
.. note::
|
||||
|
||||
@ -298,16 +313,16 @@ RC1 week
|
||||
and we can have divergence between the requirements being tested
|
||||
and being declared as correct.
|
||||
|
||||
#. In the tempest repo, create new branch specific jobs for our two branchless
|
||||
projects, devstack-gate and tempest. Configure tempest to run them on all
|
||||
changes, voting. Configure tempest to run them as periodic bitrot jobs as
|
||||
well. All this can be done in one tempest patch, like for example, see
|
||||
https://review.openstack.org/521888.
|
||||
#. Remind the QA PTL to create new branch specific jobs for our two branchless
|
||||
projects, devstack-gate and tempest, in the tempest repo. Configure tempest
|
||||
to run them on all changes, voting. Configure tempest to run them as
|
||||
periodic bitrot jobs as well. All this can be done in one tempest patch,
|
||||
for example, see https://review.openstack.org/521888.
|
||||
Configure devstack-gate to run the new jobs in check pipeline only,
|
||||
non-voting, for example see https://review.openstack.org/545144.
|
||||
|
||||
#. Add the new branch to the list of branches in the periodic-stable job
|
||||
templates in openstack-zuul-jobs. For example, see
|
||||
#. Remind the QA PTL to add the new branch to the list of branches in the
|
||||
periodic-stable job templates in openstack-zuul-jobs. For example, see
|
||||
https://review.openstack.org/545268/.
|
||||
|
||||
Between RC1 and Final
|
||||
@ -367,7 +382,7 @@ Between RC1 and Final
|
||||
is included in the metadata that goes onto the signed tag.
|
||||
|
||||
#. The week before final release test the release process using the
|
||||
openstack/release-test repository.
|
||||
``openstack/release-test`` repository to ensure our machinery is functional.
|
||||
|
||||
#. Notify the documentation team that it should be safe to apply
|
||||
their process to create the new release series landing pages for
|
||||
@ -379,29 +394,47 @@ Between RC1 and Final
|
||||
Final Release
|
||||
=============
|
||||
|
||||
1. Approve the final release patch created earlier.
|
||||
#. Approve the final release patch created earlier.
|
||||
|
||||
2. Run the missing-releases script to check for missing tarballs on the
|
||||
.. note::
|
||||
|
||||
This needs to happen several hours before the press release
|
||||
from the foundation (to give us time to handle failures) but not
|
||||
too far in advance (to avoid releasing the day before the press
|
||||
release).
|
||||
|
||||
#. Run the ``missing-releases`` script to check for missing tarballs on the
|
||||
release page before the announcement::
|
||||
|
||||
tox -e venv -- missing-releases --series $SERIES
|
||||
|
||||
3. Mark series as released on releases.o.o, by updating doc/source/index.rst
|
||||
If there are any missing deliverables, fix them.
|
||||
|
||||
#. Mark series as released on releases.o.o, by updating doc/source/index.rst
|
||||
and doc/source/$series/index.rst.
|
||||
See https://review.openstack.org/#/c/381006 for an example.
|
||||
|
||||
4. Update the default series name in
|
||||
.. note::
|
||||
|
||||
This item can be staged as a patch on top of the final release patch.
|
||||
|
||||
#. Update the default series name in
|
||||
``openstack/releases/openstack_releases/defaults.py`` to use the
|
||||
new series name.
|
||||
|
||||
5. Send release announcement email to
|
||||
.. note::
|
||||
|
||||
This item can be staged as a patch on top of the previous patch.
|
||||
Only workflow when previous step *fully* ready
|
||||
|
||||
#. Send release announcement email to
|
||||
``openstack-announce@lists.openstack.org``, based on
|
||||
``templates/final.txt``. Coordinate the timing of the email with
|
||||
the press release from the Foundation staff.
|
||||
|
||||
6. Send an email to the openstack-discuss list to point to the official
|
||||
release announcement, and declare ``openstack/releases`` unfrozen for
|
||||
releases on the new series.
|
||||
#. Send an email to the openstack-discuss list to point to the official
|
||||
release announcement from the previous step, and declare
|
||||
``openstack/releases`` unfrozen for releases on the new series.
|
||||
|
||||
Post-Final Release
|
||||
==================
|
||||
@ -417,17 +450,5 @@ Post-Final Release
|
||||
|
||||
tox -e venv -- init-series $SERIES $NEXT_SERIES
|
||||
|
||||
cycle-trailing Final Release
|
||||
============================
|
||||
|
||||
#. A week before the cycle-trailing deadline, use
|
||||
``propose-final-releases --all`` to tag the existing most recent release
|
||||
candidates as the final release for the cycle-trailing projects.
|
||||
|
||||
#. Ask liaisons and PTLs of cycle-trailing projects to review and +1
|
||||
the final release proposal from the previous step so their approval
|
||||
is included in the metadata that goes onto the signed tag.
|
||||
|
||||
#. On the cycle-trailing deadline approve the final release patch created
|
||||
earlier.
|
||||
#. Remind PTLs of cycle-trailing projects to prepare their releases.
|
||||
|
||||
|