Turn process into week-actionable items
It took a non-trivial amount of effort to turn our process into actionable items for every week of our team tracker. Start reformatting R-6 to R-4 based on what we just did for Train. Change-Id: I53189c838875836d030062fa1fd71ba7f0ae1eff
This commit is contained in:
parent
308bfe7cdf
commit
c39bd57875
|
@ -197,82 +197,227 @@ Between Milestone-2 and Milestone-3
|
|||
#. Include a reminder in the weekly countdown email reminding PTLs of the
|
||||
feature freeze deadline for cycle-highlights.
|
||||
|
||||
Final Library Release (week before Milestone-3)
|
||||
===============================================
|
||||
R-6 week (Final Library Release deadline)
|
||||
=========================================
|
||||
|
||||
#. Generate a list of all cycle-with-intermediary libraries (except client
|
||||
libraries) which have commits that have not been included in a release.
|
||||
For this, run::
|
||||
#. Propose autoreleases for cycle-with-intermediary libraries (excluding
|
||||
client libraries) which had commits that have not been included in a
|
||||
release.
|
||||
|
||||
./tools/list_library_unrelease_changes.sh
|
||||
- List them using::
|
||||
|
||||
That patch will be used as a base to communicate with the
|
||||
team: if a team wants to wait for a specific patch to make it to the
|
||||
library, someone from the team can -1 the patch to have it held, or update
|
||||
that patch with a different commit SHA.
|
||||
./tools/list_library_unrelease_changes.sh
|
||||
|
||||
.. note::
|
||||
- That patch will be used as a base to communicate with the
|
||||
team: if a team wants to wait for a specific patch to make it to the
|
||||
library, someone from the team can -1 the patch to have it held, or update
|
||||
that patch with a different commit SHA.
|
||||
|
||||
.. note::
|
||||
|
||||
At this point, we want *all* changes in the deliverables, to ensure
|
||||
that we have CI configuration up to date when the stable branch
|
||||
is created later.
|
||||
|
||||
#. Release libraries as quickly as possible this week to ensure they
|
||||
are all done before the freeze.
|
||||
- Allow the ``stable/$series`` branch to be requested with each library
|
||||
final release if they know they are ready. Do not require branching at
|
||||
this point in case of critical issues requiring another approved release
|
||||
past the freeze date.
|
||||
|
||||
- Between Tuesday and Thursday, merge as soon as possible the patches that
|
||||
get +1 from the PTL or the release liaison.
|
||||
|
||||
- On the Friday, merge patches that did not get any feedback from PTL or
|
||||
release liaison. Discuss standing -1s to see if they should be granted
|
||||
an exception and wait until next week.
|
||||
|
||||
#. Update the feature list and allowed stable branch names in
|
||||
devstack-gate for the new stable branch. For
|
||||
example, https://review.opendev.org/362435 and
|
||||
https://review.opendev.org/363084
|
||||
|
||||
#. Allow the ``stable/$series`` branch to be requested with each library final
|
||||
release if they know they are ready. Do not require branching at this point
|
||||
in case of critical issues requiring another approved release past the
|
||||
freeze date.
|
||||
#. At the end of the week, send weekly email content preparing for R-5 week::
|
||||
|
||||
Milestone-3
|
||||
===========
|
||||
Development Focus
|
||||
-----------------
|
||||
|
||||
#. Generate a list of all cycle-with-intermediary client libraries which
|
||||
have commits that have not been included in a release.
|
||||
For this, run::
|
||||
We are getting close to the end of the $series cycle! Next week on
|
||||
$milestone3 is the $series-3 milestone, also known as feature freeze.
|
||||
It's time to wrap up feature work in the services and their client
|
||||
libraries, and defer features that won't make it to the $next-series cycle.
|
||||
|
||||
./tools/list_client_library_unreleased_changes.sh
|
||||
General Information
|
||||
-------------------
|
||||
|
||||
That patch will be used as a base
|
||||
to communicate with the team: if a team wants to wait for a specific patch
|
||||
to make it to the library, someone from the team can -1 the patch to have
|
||||
it held, or update that patch with a different commit SHA.
|
||||
This coming week is the deadline for client libraries: their last feature
|
||||
release needs to happen before "Client library freeze" on $milestone3.
|
||||
Only bugfix releases will be allowed beyond this point.
|
||||
|
||||
When requesting those library releases, you can also include the
|
||||
stable/$series branching request with the review. As an example, see the
|
||||
"branches" section here:
|
||||
https://opendev.org/openstack/releases/src/branch/master/deliverables/pike/os-brick.yaml#n2
|
||||
|
||||
$milestone3 is also the deadline for feature work in all OpenStack
|
||||
deliverables following the cycle-with-rc model. To help those projects
|
||||
produce a first release candidate in time, only bugfixes should be allowed
|
||||
in the master branch beyond this point. Any feature work past that deadline
|
||||
has to be raised as a Featur Freeze Exception (FFE) and approved by the
|
||||
team PTL.
|
||||
|
||||
Finally, feature freeze is also the deadline for submitting a first version
|
||||
of your cycle-highlights. Cycle highlights are the raw data hat helps shape
|
||||
what is communicated in press releases and other release activity at the
|
||||
end of the cycle, avoiding direct contacts from marketing folks. See
|
||||
https://docs.openstack.org/project-team-guide/release-management.html#cycle-highlights
|
||||
for more details.
|
||||
|
||||
Upcoming Deadlines & Dates
|
||||
--------------------------
|
||||
|
||||
$series-3 milestone (feature freeze): $milestone3 (R-5 week)
|
||||
RC1 deadline: $rc1-deadline (R-3 week)
|
||||
Final RC deadline: $final-rc-deadline (R-1 week)
|
||||
Final Train release: $release-date
|
||||
$other-upcoming-event
|
||||
|
||||
|
||||
R-5 week (Milestone-3)
|
||||
======================
|
||||
|
||||
#. Process any remaining library freeze exception.
|
||||
|
||||
#. Early in the week, email openstack-discuss list to remind PTLs that
|
||||
cycle-highlights are due this week so that they can be included in
|
||||
release marketing preparations.
|
||||
|
||||
#. Propose autoreleases for cycle-with-intermediary client libraries which
|
||||
had commits that have not been included in a release.
|
||||
|
||||
- List them using::
|
||||
|
||||
./tools/list_client_library_unreleased_changes.sh
|
||||
|
||||
- That patch will be used as a base
|
||||
to communicate with the team: if a team wants to wait for a specific patch
|
||||
to make it to the library, someone from the team can -1 the patch to have
|
||||
it held, or update that patch with a different commit SHA.
|
||||
|
||||
- Allow the ``stable/$series`` branch to be requested with each client
|
||||
library final release if they know they are ready. Do not require
|
||||
branching at this point in case of critical issues requiring another
|
||||
approved release past the freeze date.
|
||||
|
||||
- Between Tuesday and Thursday, merge as soon as possible the patches that
|
||||
get +1 from the PTL or the release liaison.
|
||||
|
||||
- On the Friday, merge patches that did not get any feedback from PTL or
|
||||
release liaison. Discuss standing -1s to see if they should be granted
|
||||
an exception and wait until next week.
|
||||
|
||||
#. Evaluate any libraries that did not have any change merged over the
|
||||
cycle to see if it is time to `transition them to the independent release
|
||||
model <https://releases.openstack.org/reference/release_models.html#openstack-related-libraries>`__.
|
||||
|
||||
If it is OK to transition them, move the deliverable file to the ``_independent`` directory.
|
||||
If it is OK to transition them, propose to move the deliverable file to
|
||||
the ``_independent`` directory.
|
||||
|
||||
If it is not OK to transition them, create a new stable branch from the latest release
|
||||
from the previous series.
|
||||
If it is not OK to transition them, create a new stable branch from the
|
||||
latest release from the previous series.
|
||||
|
||||
#. Remind the requirements team to freeze changes to
|
||||
#. List cycle-with-intermediary deliverables that have not been released yet::
|
||||
|
||||
tox -e venv -- list-deliverables --unreleased \
|
||||
--model cycle-with-intermediary \
|
||||
--type horizon-plugin --type other --type service
|
||||
|
||||
Send a separate email targeted to teams with such unreleased deliverables
|
||||
saying::
|
||||
|
||||
Quick reminder that we'll need a release very soon for a number of
|
||||
deliverables following a cycle-with-intermediary release model but which
|
||||
have not done *any* release yet in the $series cycle:
|
||||
|
||||
{{list-of-deliverables}}
|
||||
|
||||
Those should be released ASAP, and in all cases before $rc1-deadline, so
|
||||
that we have a release to include in the final $series release.
|
||||
|
||||
#. On Friday, remind the requirements team to freeze changes to
|
||||
``openstack/requirements`` by applying -2 to all
|
||||
open patches. Ensure that reviewers do not approve changes created
|
||||
by the proposal bot, but do approve changes for new OpenStack deliverable
|
||||
releases.
|
||||
|
||||
#. Allow the ``stable/$series`` branch to be requested with each client library
|
||||
final release if they know they are ready. Do not require branching at this
|
||||
point in case of critical issues requiring another approved release past the
|
||||
freeze date.
|
||||
#. At the end of the week, send weekly email content for R-3 week::
|
||||
|
||||
#. Remind PTLs/liaisons that master should be frozen except for bug
|
||||
fixes and feature work with FFEs.
|
||||
Development Focus
|
||||
-----------------
|
||||
|
||||
#. Email openstack-discuss list to remind PTLs that cycle-highlights are due
|
||||
this week so that they can be included in release marketing preparations.
|
||||
We just passed feature freeze! Until release branches are cut, you
|
||||
should stop accepting featureful changes to deliverables following the
|
||||
cycle-with-rc release model, or to libraries. Exceptions should be
|
||||
discussed on separate threads on the mailing-list, and feature freeze
|
||||
exceptions approved by the team's PTL.
|
||||
|
||||
#. Remind PTL/liaisons to start preparing "prelude" release notes as
|
||||
summaries of the content of the release so that those are merged
|
||||
before their first release candidate.
|
||||
Focus should be on finding and fixing release-critical bugs, so that
|
||||
release candidates and final versions of the $series deliverables can be
|
||||
proposed, well ahead of the final $series release date.
|
||||
|
||||
General Information
|
||||
-------------------
|
||||
|
||||
We are still finishing up processing a few release requests, but the
|
||||
$series release requirements are now frozen. If new library releases are
|
||||
needed to fix release-critical bugs in $series, you must request a
|
||||
Requirements Freeze Exception (RFE) from the requirements team before we
|
||||
can do a new release to avoid having something released in $series that
|
||||
is not actually usable. This is done by posting to the openstack-discuss
|
||||
mailing list with a subject line similar to:
|
||||
|
||||
[$PROJECT][requirements] RFE requested for $PROJECT_LIB
|
||||
|
||||
Include justification/reasoning for why a RFE is needed for this lib.
|
||||
If/when the requirements team OKs the post-freeze update, we can then
|
||||
process a new release.
|
||||
|
||||
A soft String freeze is now in effect, in order to let the I18N team do the
|
||||
translation work in good conditions. In Horizon and the various dashboard
|
||||
plugins, you should stop accepting changes that modify user-visible
|
||||
strings. Exceptions should be discussed on the mailing-list. By
|
||||
$rc-final-date this will become a hard string freeze, with no changes
|
||||
in user-visible strings allowed.
|
||||
|
||||
Actions
|
||||
-------
|
||||
|
||||
stable/$series branches should be created soon for all not-already-branched
|
||||
libraries. You should expect 2-3 changes to be proposed for each: a
|
||||
.gitreview update, a reno update (skipped for projects not using reno),
|
||||
and a tox.ini constraints URL update. Please review those in priority
|
||||
so that the branch can be functional ASAP.
|
||||
|
||||
The Prelude section of reno release notes is rendered as the top level
|
||||
overview for the release. Any important overall messaging for $series
|
||||
changes should be added there to make sure the consumers of your release
|
||||
notes see them.
|
||||
|
||||
Finally, if you haven't proposed $series cycle-highlights yet, you are
|
||||
already late to the party. Please see $email for details.
|
||||
|
||||
Upcoming Deadlines & Dates
|
||||
--------------------------
|
||||
|
||||
RC1 deadline: $rc1-deadline (R-3 week)
|
||||
Final RC deadline: $final-rc-deadline (R-1 week)
|
||||
Final Train release: $release-date
|
||||
$other-upcoming-event
|
||||
|
||||
|
||||
R-4 week
|
||||
========
|
||||
|
||||
#. Process any remaining client library freeze exception.
|
||||
|
||||
#. Freeze all cycle-based library releases except for release-critical
|
||||
bugs. Independently-released libraries may still be released, but
|
||||
|
@ -282,19 +427,23 @@ Milestone-3
|
|||
.. note::
|
||||
|
||||
Do not release libraries without a link to a message to openstack-discuss
|
||||
requesting a requirements FFE and an approval response from that team.
|
||||
requesting a requirements RFE and an approval response from that team.
|
||||
|
||||
Between Milestone-3 and RC1
|
||||
===========================
|
||||
#. Propose ``stable/$series`` branch creation for all client and non-client
|
||||
libraries that had not requested it at freeze time.
|
||||
|
||||
#. List cycle-with-intermediary deliverables that have not been released yet::
|
||||
- The following command may be used::
|
||||
|
||||
tox -e venv -- list-deliverables --unreleased
|
||||
--model cycle-with-intermediary \
|
||||
--type horizon-plugin --type other --type service
|
||||
tox -e venv -- propose-library-branches --include-clients
|
||||
|
||||
Remind teams with such unreleased deliverables that they have until the RC1
|
||||
deadline to produce a release for those.
|
||||
- That patch will be used as a base
|
||||
to communicate with the team: if a team wants to wait for a specific patch
|
||||
to make it to the library, someone from the team can -1 the patch to have
|
||||
it held, or update that patch with a different commit SHA.
|
||||
|
||||
- On the Friday, merge patches that did not get any feedback from PTL or
|
||||
release liaison. Discuss standing -1s to see if they should be granted
|
||||
an exception and wait until next week.
|
||||
|
||||
#. List cycle-with-intermediary deliverables that have not been refreshed in
|
||||
the last 2 months. For this, use the following command, with YYYY-MM-DD
|
||||
|
@ -304,106 +453,204 @@ Between Milestone-3 and RC1
|
|||
--model cycle-with-intermediary \
|
||||
--type horizon-plugin --type other --type service
|
||||
|
||||
Warn teams with deliverables that have releases more than 2 months old
|
||||
that we will use their existing release as a point for branching if they
|
||||
have not prepared a newer release by the final RC deadline.
|
||||
Send a separate email targeted to teams with such old deliverables
|
||||
saying::
|
||||
|
||||
#. Propose ``stable/$series`` branch creation for all client and non-client
|
||||
libraries that had not requested it at freeze time. The following command
|
||||
may be used::
|
||||
Quick reminder that for deliverables following the cycle-with-intermediary
|
||||
model, the release team will use the latest $series release available on
|
||||
release week.
|
||||
|
||||
tox -e venv -- propose-library-branches --include-clients
|
||||
The following deliverables have done a $series release, but it was not
|
||||
refreshed in the last two months:
|
||||
|
||||
RC1 week
|
||||
{{list_of_deliverables}}
|
||||
|
||||
You should consider making a new one very soon, so that we don't use an
|
||||
outdated version for the final release.
|
||||
|
||||
#. At the end of the week, send weekly email content preparing for R-3 week::
|
||||
|
||||
Development Focus
|
||||
-----------------
|
||||
|
||||
The Release Candidate (RC) deadline is next Thursday, $rc1-deadline. Work
|
||||
should be focused on fixing any release-critical bugs.
|
||||
|
||||
General Information
|
||||
-------------------
|
||||
|
||||
All deliverables released under a cycle-with-rc model should have a first
|
||||
release candidate by the end of the week, from which a stable/$series
|
||||
branch will be cut. This branch will track the $series release.
|
||||
|
||||
Once stable/$series has been created, master will will be ready to switch
|
||||
to $next-series development. While master will no longer be feature-frozen,
|
||||
please prioritize any work necessary for completing $series plans.
|
||||
Release-critical bugfixes will need to be merged in the master branch
|
||||
first, then backported to the stable/$series branch before a new release
|
||||
candidate can be proposed.
|
||||
|
||||
Actions
|
||||
-------
|
||||
|
||||
Early in the week, the release team will be proposing RC1 patches for all
|
||||
cycle-with-rc projects, using the latest commit from master. If your team
|
||||
is ready to go for cutting RC1, please let us know by leaving a +1 on these
|
||||
patches.
|
||||
|
||||
If there are still a few more patches needed before RC1, you can -1 the
|
||||
patch and update it later in the week with the new commit hash you would
|
||||
like to use. Remember, stable/$series branches will be created with this,
|
||||
so you will want to make sure you have what you need included to avoid
|
||||
needing to backport changes from master (which will technically then be
|
||||
$next-series) to this stable branch for any additional RCs before the final
|
||||
release.
|
||||
|
||||
The release team will also be proposing releases for any deliverable
|
||||
following a cycle-with-intermediary model that has not produced any $series
|
||||
release so far.
|
||||
|
||||
Finally, now is a good time to finalize release highlights. Release
|
||||
highlights help shape the messaging around the release and make sure that
|
||||
your work is properly represented.
|
||||
|
||||
Upcoming Deadlines & Dates
|
||||
--------------------------
|
||||
|
||||
RC1 deadline: $rc1-deadline (R-3 week)
|
||||
Final RC deadline: $final-rc-deadline (R-1 week)
|
||||
Final Train release: $release-date
|
||||
$other-upcoming-event
|
||||
|
||||
|
||||
R-3 week (RC1 deadline)
|
||||
=======================
|
||||
|
||||
#. Process any remaining library branching exception.
|
||||
|
||||
#. On the Monday, generate release requests for all deliverables
|
||||
that have do not have a suitable Train candidate yet. That includes:
|
||||
|
||||
- Using `release-test` as a canary test. `release-test`
|
||||
needs to have a RC1 anyway for preparing the final release.
|
||||
|
||||
- cycle-with-intermediary deliverables that have not released yet, for
|
||||
which a release should be proposed from HEAD, and include stable branch
|
||||
creation. You can list those using::
|
||||
|
||||
tox -e venv -- list-deliverables --unreleased \
|
||||
--model cycle-with-intermediary \
|
||||
--type horizon-plugin --type other --type service
|
||||
|
||||
- cycle-with-rc deliverables that have not done a RC1 yet, for which
|
||||
a release should be proposed from HEAD, and include stable branch
|
||||
creation. You can list those using::
|
||||
|
||||
tox -e venv -- list-deliverables --missing-rc --model cycle-with-rc
|
||||
|
||||
- cycle-automatic deliverables, for which a final release should be
|
||||
proposed from HEAD (unless there is an existing release in the cycle
|
||||
and no change was merged since). Those should **not** include stable
|
||||
branch creation. You can list those using::
|
||||
|
||||
tox -e venv -- list-deliverables --model cycle-automatic
|
||||
|
||||
- Those patches will be used as a base to communicate with the team:
|
||||
if a team wants to wait for a specific patch to make it to the release,
|
||||
someone from the team can -1 the patch to have it held, or update
|
||||
that patch with a different commit SHA.
|
||||
|
||||
- Between Tuesday and Thursday, merge as soon as possible the patches that
|
||||
get +1 from the PTL or the release liaison.
|
||||
|
||||
- By EOD Thursday, ideally we would want a +1 from the PTL and/or
|
||||
release liaison to indicate approval. However we will consider the
|
||||
absence of -1 or otherwise negative feedback as an indicator that the
|
||||
automatically proposed patches can be approved.
|
||||
|
||||
- On the Friday, merge patches that did not get any feedback from PTL or
|
||||
release liaison. Discuss standing -1s to see if they should be granted
|
||||
an exception and wait until next week.
|
||||
|
||||
|
||||
R-2 week
|
||||
========
|
||||
|
||||
#. Early in the week, generate release requests for all cycle-with-intermediary
|
||||
deliverables that have not been released yet. You can list those using::
|
||||
#. Process any standing RC1 deadline exceptions.
|
||||
|
||||
tox -e venv -- list-deliverables --unreleased
|
||||
--model cycle-with-intermediary \
|
||||
--type horizon-plugin --type other --type service
|
||||
#. On the Monday, generate stable branches for all cycle deliverables that
|
||||
are still missing one. You can list those using::
|
||||
|
||||
#. At the same time, generate RC1 release requests (including the
|
||||
``stable/$series`` branch creation) for all cycle-with-rc deliverables.
|
||||
|
||||
Keep in mind you can use `release-test` as a canary test. `release-test`
|
||||
needs to have a RC1 anyway for preparing the final release.
|
||||
tox -e venv -- list-deliverables --no-stable-branch
|
||||
|
||||
#. Those patches will be used as a base to communicate with the team:
|
||||
if a team wants to wait for a specific patch to make it to the release,
|
||||
someone from the team can -1 the patch to have it held, or update
|
||||
that patch with a different commit SHA.
|
||||
if a team wants to wait and make another release before the branch is
|
||||
cut, someone from the team can -1 the patch to have it held, or update
|
||||
that patch to include another release and stable branch point.
|
||||
|
||||
#. Generate release requests (without ``stable/$series`` branch creation)
|
||||
for all cycle-automatic deliverables.
|
||||
#. Between Tuesday and Thursday, merge as soon as possible the patches that
|
||||
get +1 from the PTL or the release liaison.
|
||||
|
||||
#. By the end of the week, ideally we would want a +1 from the PTL and/or
|
||||
release liaison to indicate approval. However we will consider the absence
|
||||
of -1 or otherwise negative feedback as an indicator that the automatically
|
||||
proposed patches can be approved at the end of the RC deadline week.
|
||||
#. On the Friday, merge patches that did not get any feedback from PTL or
|
||||
release liaison. Discuss standing -1s to see if they should be granted
|
||||
an exception and wait until next week.
|
||||
|
||||
#. After all the projects enabled in devstack by default have been branched,
|
||||
remind the QA PTL to create a branch in the devstack repository. Devstack
|
||||
doesn't push a tag at RC1 it is just branched off of HEAD.
|
||||
we can engage with the QA, I18n and Requirements PTLs to finalize the
|
||||
stable branch setup:
|
||||
|
||||
#. After devstack is branched, remind the QA PTL to create a branch in the
|
||||
grenade repository. As with devstack, it will branch from HEAD instead of a
|
||||
tag.
|
||||
- Remind the QA PTL to create a branch in the devstack repository.
|
||||
Devstack doesn't push a tag at RC1 it is just branched off of HEAD.
|
||||
|
||||
#. Remind the QA PTL to update the default branch for devstack in the new
|
||||
stable branch. For example, https://review.opendev.org/#/c/493208/
|
||||
- After devstack is branched, remind the QA PTL to create a branch in the
|
||||
grenade repository. As with devstack, it will branch from HEAD instead
|
||||
of a tag.
|
||||
|
||||
#. Remind the QA PTL to update the grenade settings in devstack-gate for the
|
||||
new branch. For example, https://review.opendev.org/362438.
|
||||
- Remind the QA PTL to update the default branch for devstack in the new
|
||||
stable branch. For example, https://review.opendev.org/#/c/493208/
|
||||
|
||||
.. note::
|
||||
- Remind the QA PTL to update the grenade settings in devstack-gate for the
|
||||
new branch. For example, https://review.opendev.org/362438.
|
||||
|
||||
As soon as grenade is updated for the new branch (see the RC1
|
||||
instructions that follow), projects without stable branches may
|
||||
start seeing issues with their grenade jobs because without the
|
||||
stable branch the branch selection will cause the jobs to run
|
||||
master->master instead of previous->master. At the end of Ocata
|
||||
this caused trouble for the Ironic team, for example.
|
||||
.. note::
|
||||
|
||||
#. Remind the I18n PTL to update the translation tools for the new stable
|
||||
series.
|
||||
As soon as grenade is updated for the new branch (see the RC1
|
||||
instructions that follow), projects without stable branches may
|
||||
start seeing issues with their grenade jobs because without the
|
||||
stable branch the branch selection will cause the jobs to run
|
||||
master->master instead of previous->master. At the end of Ocata
|
||||
this caused trouble for the Ironic team, for example.
|
||||
|
||||
#. After all cycle-with-rc projects have their branches created, remind the
|
||||
requirements PTL to propose an update to the deliverable file to create the
|
||||
``stable/$series`` branch for ``openstack/requirements``. Then announce that
|
||||
the requirements freeze is lifted from master.
|
||||
- Remind the I18n PTL to update the translation tools for the new stable
|
||||
series.
|
||||
|
||||
.. note::
|
||||
- After all cycle-with-rc projects have their branches created, remind the
|
||||
requirements PTL to propose an update to the deliverable file to create
|
||||
the ``stable/$series`` branch for ``openstack/requirements``. Then
|
||||
announce that the requirements freeze is lifted from master.
|
||||
|
||||
We wait until after the other projects have branched to
|
||||
create the branch for requirements because tests for the stable
|
||||
branches of those projects will fall back to using the master
|
||||
branch of requirements until the same stable branch is created,
|
||||
but if the branch for the requirements repo exists early the
|
||||
changes happening in master on the other projects will not use it
|
||||
and we can have divergence between the requirements being tested
|
||||
and being declared as correct.
|
||||
.. note::
|
||||
|
||||
#. Remind the QA PTL to create new branch specific jobs for our two branchless
|
||||
projects, devstack-gate and tempest, in the tempest repo. Configure tempest
|
||||
to run them on all changes, voting. Configure tempest to run them as
|
||||
periodic bitrot jobs as well. All this can be done in one tempest patch,
|
||||
for example, see https://review.opendev.org/521888.
|
||||
Configure devstack-gate to run the new jobs in check pipeline only,
|
||||
non-voting, for example see https://review.opendev.org/545144.
|
||||
We wait until after the other projects have branched to
|
||||
create the branch for requirements because tests for the stable
|
||||
branches of those projects will fall back to using the master
|
||||
branch of requirements until the same stable branch is created,
|
||||
but if the branch for the requirements repo exists early the
|
||||
changes happening in master on the other projects will not use it
|
||||
and we can have divergence between the requirements being tested
|
||||
and being declared as correct.
|
||||
|
||||
#. Remind the QA PTL to add the new branch to the list of branches in the
|
||||
periodic-stable job templates in openstack-zuul-jobs. For example, see
|
||||
https://review.opendev.org/545268/.
|
||||
- Remind the QA PTL to create new branch specific jobs for our two
|
||||
branchless projects, devstack-gate and tempest, in the tempest repo.
|
||||
Configure tempest to run them on all changes, voting. Configure tempest
|
||||
to run them as periodic bitrot jobs as well. All this can be done in one
|
||||
tempest patch, for example, see https://review.opendev.org/521888.
|
||||
Configure devstack-gate to run the new jobs in check pipeline only,
|
||||
non-voting, for example see https://review.opendev.org/545144.
|
||||
|
||||
Between RC1 and Final
|
||||
=====================
|
||||
|
||||
#. In the countdown email, remind everyone that the latest RC (for
|
||||
cycle-with-rc deliverables) or the latest intermediary release (for
|
||||
cycle-with-intermediary deliverables) will automatically be used as
|
||||
the final $series release on release day.
|
||||
- Remind the QA PTL to add the new branch to the list of branches in the
|
||||
periodic-stable job templates in openstack-zuul-jobs. For example, see
|
||||
https://review.opendev.org/545268/.
|
||||
|
||||
#. Let cycle-with-rc projects iterate on RCs as needed. The final release
|
||||
candidate for each project needs to be prepared at least one week before
|
||||
|
@ -420,6 +667,15 @@ Between RC1 and Final
|
|||
them WIP until actually ready, so the release team knows that more
|
||||
candidates are coming.
|
||||
|
||||
|
||||
R-1 week (Final RC deadline)
|
||||
============================
|
||||
|
||||
#. In the countdown email, remind everyone that the latest RC (for
|
||||
cycle-with-rc deliverables) or the latest intermediary release (for
|
||||
cycle-with-intermediary deliverables) will automatically be used as
|
||||
the final $series release on release day.
|
||||
|
||||
#. Ensure that all projects that are publishing release notes have the
|
||||
notes link included in their deliverable file. See
|
||||
``tools/add_release_note_links.sh``.
|
||||
|
@ -429,9 +685,6 @@ Between RC1 and Final
|
|||
#. When all translations and bug fixes are merged for a project,
|
||||
prepare a new release candidate.
|
||||
|
||||
#. After final releases for release:cycle-with-intermediary projects
|
||||
are tagged, create their stable branches.
|
||||
|
||||
#. On the morning of the deadline for final release candidates, check
|
||||
the list of unreleased changes for cycle-with-rc projects and verify
|
||||
with the PTLs and liaisons that they are planning a release or that
|
||||
|
@ -441,9 +694,6 @@ Between RC1 and Final
|
|||
|
||||
$ ./tools/list_rc_updates.sh
|
||||
|
||||
#. Propose stable/$series branch creation for deliverables that have not
|
||||
requested it yet.
|
||||
|
||||
#. As soon as the last release candidate is tagged and the freeze
|
||||
period is entered, use ``propose-final-releases`` to tag the
|
||||
existing most recent release candidates as the final release for
|
||||
|
@ -453,8 +703,8 @@ Between RC1 and Final
|
|||
the final release proposal from the previous step so their approval
|
||||
is included in the metadata that goes onto the signed tag.
|
||||
|
||||
#. The week before final release test the release process using the
|
||||
``openstack/release-test`` repository to ensure our machinery is functional.
|
||||
#. Test the release process using the ``openstack/release-test``
|
||||
repository to ensure our machinery is functional.
|
||||
|
||||
#. Notify the documentation team that it should be safe to apply
|
||||
their process to create the new release series landing pages for
|
||||
|
@ -463,8 +713,9 @@ Between RC1 and Final
|
|||
can do the work before the final release date to avoid having to
|
||||
synchronize with the release team on that day.
|
||||
|
||||
Final Release
|
||||
=============
|
||||
|
||||
R+0 week (Final Release)
|
||||
========================
|
||||
|
||||
#. Approve the final release patch created earlier.
|
||||
|
||||
|
@ -508,10 +759,10 @@ Final Release
|
|||
release announcement from the previous step, and declare
|
||||
``openstack/releases`` unfrozen for releases on the new series.
|
||||
|
||||
Post-Final Release
|
||||
==================
|
||||
R+1 week
|
||||
========
|
||||
|
||||
#. The week after the final release, process any late or blocked
|
||||
#. Process any late or blocked
|
||||
release requests for deliverables for any branch (treating the new
|
||||
series branch as stable).
|
||||
|
||||
|
|