Release final metalsmith for 2023.2 Bobcat
This proposed a release for metalsmith to get any final merged changes out prior to the lib freeze for 2023.2 Bobcat going into effect. If the team is ready to proceed, please leave a +1 to acknowledge this release and we will process right away. If the team is working on any final merges, leave a -1 with some detail on the status and update the patch with the new commit hash to use when ready. Patches with no response will be merged by Friday, August 25th. $ git log --oneline --no-merges 2.0.0..968c9a0 968c9a0 Remove CentOS Stream 8 jobs a3b966d Add a CentOS Stream 9 bios job b63793d Use jammy nodes to run CI jobs 97b95f1 Add centos9 based job Change-Id: I2f5264b77374a76047eab4657741ab2d7cd947f9 Signed-off-by: Elod Illes <elod.illes@est.tech>
This commit is contained in:
parent
cc673e77cd
commit
ca89f8d2e3
@ -10,3 +10,7 @@ releases:
|
|||||||
projects:
|
projects:
|
||||||
- repo: openstack/metalsmith
|
- repo: openstack/metalsmith
|
||||||
hash: 96783e2613057024244874c50e7b567c75c5d764
|
hash: 96783e2613057024244874c50e7b567c75c5d764
|
||||||
|
- version: 2.0.1
|
||||||
|
projects:
|
||||||
|
- repo: openstack/metalsmith
|
||||||
|
hash: 968c9a0608970ef255a6228092159dd7142d8759
|
||||||
|
Loading…
Reference in New Issue
Block a user