Release final metalsmith for 2023.2 Bobcat

This proposed a release for metalsmith to get any final merged
changes out prior to the lib freeze for 2023.2 Bobcat going into effect.

If the team is ready to proceed, please leave a +1 to acknowledge this
release and we will process right away. If the team is working on any
final merges, leave a -1 with some detail on the status and update the
patch with the new commit hash to use when ready.

Patches with no response will be merged by Friday, August 25th.

$ git log --oneline --no-merges 2.0.0..968c9a0
968c9a0 Remove CentOS Stream 8 jobs
a3b966d Add a CentOS Stream 9 bios job
b63793d Use jammy nodes to run CI jobs
97b95f1 Add centos9 based job

Change-Id: I2f5264b77374a76047eab4657741ab2d7cd947f9
Signed-off-by: Elod Illes <elod.illes@est.tech>
This commit is contained in:
Elod Illes 2023-08-21 22:14:44 +02:00 committed by Riccardo Pittau
parent cc673e77cd
commit ca89f8d2e3

View File

@ -10,3 +10,7 @@ releases:
projects:
- repo: openstack/metalsmith
hash: 96783e2613057024244874c50e7b567c75c5d764
- version: 2.0.1
projects:
- repo: openstack/metalsmith
hash: 968c9a0608970ef255a6228092159dd7142d8759