If any of the deliverables does not have a release note link added,
then the generated "reno-$series" (example: [1]) patch was not merged
in time (or at all). Please merge these patches as soon as possible.
This patch adds some missed reno links for bobcat deliverables as well
as some antelope and a zed reno link.
[1] https://review.opendev.org/q/topic:reno-2023.2+is:open
Change-Id: I02bde24cfb80e38d74654be2794c85394a76b589
This proposed a RC1 release for keystone to get any merged changes
out prior to the RC1 deadline for Antelope going into effect.
If the team is ready to proceed, please leave a +1 to acknowledge this
release and we will process right away. If the team is working on any
final merges, leave a -1 with some detail on the status and update the
patch with the new commit hash to use when ready.
Patches with no response will be merged by early Friday, March 03.
Signed-off-by: Hervé Beraud <hberaud@redhat.com>
Change-Id: I79d3803112901d8cdc228b76dd238f39cc85215c
The generated content initializes the 2023.1 Antelope cycle's
deliverable files based on Zed deliverables.
Change-Id: I7ed646e43002084aa791483e56046d94762fff75