With the new resolution '2023-07-24 Unmaintained status replaces
Extended Maintenance' [1] the last 3 EM branches (Xena, Wallaby,
Victoria) will transition to Unmaintained, but older branches (Ussuri,
Train) should move to End of Life unless someone steps up as maintainer
of this branch for this project.
To signal this, please add a -1 for this patch if you or the team want
to keep this branch open for further maintenance.
If there is no response from anyone within a reasonable time frame,
then PTLs/release liaisons will be asked to confirm the EOL transition
with their +1.
[1] https://governance.openstack.org/tc/resolutions/20230724-unmaintained-branches.html
Change-Id: Ie88695c2c2f05adc29069788c3ffc4095702b8e5
This transition the ussuri branch to extended maintenance.
Changes for bugfixes and things the team deems important are
still encouraged, but there will no longer be official releases
off of the branch.
Please +1 if the team is ready for us to proceed with this
transition, or -1 if there are any final backports currently in
flight that we should wait for. For the latter case, please
update the patch with the new commit hash after doing a final
release to get those changes out so we know to proceed with the
transition.
Change-Id: I418baea7bb00ce21765188708a8f689c62f43d1f
These are the final release taggings for all cycle-with-rc projects.
While not required, having PTLs ack this patch would be nice to include
that record in the merged metadata.
Release activity should now be frozen until this is processed on May 13.
Any bugfixes merged to stable/ussuri can be queued up and ready to go as
a follow on stable release after the coordinated release date.
Since it always comes up - yes, the diff-start is right. That's the
calculated starting point where the last stable branch was created.
Change-Id: I66602ca7a6ab1af35bf33d4d82fe34191f2e3865
Signed-off-by: Sean McGinnis <sean.mcginnis@gmail.com>
RC1 release for tacker-horizon. Please +1 if things are
ready to go, or -1 if the team needs a little more
time. If so, please update this patch with the new
commit hash to use when ready.
If no response, this patch will be approved soon
after the April 23 deadline.
Change-Id: I555ee282c13392e01fe8590be7addd00d058add9
Signed-off-by: Sean McGinnis <sean.mcginnis@gmail.com>
Deliverables following the cycle-with-intermediary model are expected
to release multiple times throughout the development cycle. Since
tacker-horizon only released once last cycle, and has not done a release
yet this cycle, this proposes changing the release model to cycle-with-rc
so the expectation is only that it will release an RC by the end of
the cycle prior to doing the final release.
For the team, please respond to this patch in one of the following ways:
* -1 this patch and follow up with an intermediary release
* +1 this patch and we will switch over the release model
* -1 this patch, but acknowledge a release will be done prior to the
RC1 deadline.
Change-Id: I3a553d7cb7922ff90ba2b099e023af92a8a85fa9
Signed-off-by: Sean McGinnis <sean.mcginnis@gmail.com>
Adds deliverable stubs based on what was released in Train.
Change-Id: Iab182666ea65cdb7ea7e023853b18eaa9c57403b
Signed-off-by: Sean McGinnis <sean.mcginnis@gmail.com>