This transition the wallaby branch to extended maintenance.
Changes for bugfixes and things the team deems important are
still encouraged, but there will no longer be official releases
off of the branch.
Please +1 if the team is ready for us to proceed with this
transition, or -1 if there are any final backports currently in
flight that we should wait for. For the latter case, please
update the patch with the new commit hash after doing a final
release to get those changes out so we know to proceed with the
transition.
The transition deadline is November 2nd, 2022.
Change-Id: If2fb9e27942d9f51230ab87a69263b9b04335f3b
Released changes are mostly related to requirements pins however
they fix downstream issues, so they are worth releasing.
Change-Id: I94b81c95184dd2564ebf61aff7b8940d8a0c4776
This generated patch adds missing wallaby release note page link if that
page exists for a deliverable.
If any of your deliverables does not have a release note link added in
this patch, then please check whether there is an open patch on that
repository with the topic "reno-wallaby" [1] still waiting to be
approved.
[1] https://review.opendev.org/q/topic:reno-wallaby
Change-Id: Ie3abb8f841a5990d973956cd5d656829a47f27df
This new version will release bugfixes.
Notice that a minor version (2.9.0) of tooz have been released few days
ago so even if requirements have been updated in the landed changes we
need to stick to bugfix versions.
Change-Id: I27c938feeea6ee95551bd3d103694dc9e849698e
This creates the stable/wallaby branch for any non-client libraries
now that we are past the lib freeze on March 11.
Change-Id: Ia6fc6d1965bd80fde4d324d8757a96dc383a19f6