Shamelessly steal^Wcopy some of the code from interactive-release so
that after validating the release we list the changes that will be
released. This gives us the ability to decide that the release
contains no functional changes and elect to not create that release.
NOTE: I chose not to use interactive-release as it seems not to
correctly handle first releases in a series (because it doesn't load all
release history. It also doesn't use some of the new features (like
series_status). Adding --interactive to new-release gets us a long way
to deprecating interactive-release but we aren't quire there yet.
Change-Id: I25bbb4d7df9ae618500dd37f4b0cbc32c0bbd153
This adds some zuul checks to not run jobs when only the data files have
been changed.
Change-Id: I74805f37373338d1c5763eb7d6af1d29f219e5ea
Signed-off-by: Sean McGinnis <sean.mcginnis@gmail.com>
Move R+1 week process items to the top of the document, remove obsolete
steps and merge the remaning ones with pre-PTG steps. Include weekly
email content. Move the step about proposing a schedule for the next
release to "between m-2 and m-3", as this is when we actually do that.
Change-Id: I5a4a7e5e059156139944a09e4d7813bd11ec1c5a
Now that we use gitea, our README.rst is more visble and should be
made a decent entry point to the marvelous world of release management.
This change make it look better, clearer, and updates links.
Change-Id: If331975e16e9d60b9839491354679d9c1a027217
As Murano has been merged after branching, but was announced and
OSA is lagging behind, it's probably worth to branch murano
for train.
Change-Id: I7334d1671410160df9f235a53af6c7dbade7a96c
As we decided during Shanghai PTG for branch which is in EM we will
run neutron-tempest-plugin jobs with specific tag, not from master
always.
So lets release new version of neutron-tempest-plugin now and we will be
able to use this version for queens jobs instead of using still tests
from master branch.
Change-Id: Id8c7d2e6b52aee35ada9ee89708b08c12b8dc20c
As I have stepped out, and trained noonedeadpunk for release
business, I now have the impression I can remove this from my belt.
I trust him to do the right thing, and he can ask for my help if
necessary.
Change-Id: I935c855886fd2bef61ef3c23453f06ac2b14955d
Manila feature freeze was called out for the same time as the overall
feature freeze. This removes it since there is no additional information
or different date for the project specific deadline.
Change-Id: I253f316a64b40048d74b93a06e238a69b0bda242
Signed-off-by: Sean McGinnis <sean.mcginnis@gmail.com>