This transition the ussuri branch to extended maintenance.
Changes for bugfixes and things the team deems important are
still encouraged, but there will no longer be official releases
off of the branch.
Please +1 if the team is ready for us to proceed with this
transition, or -1 if there are any final backports currently in
flight that we should wait for. For the latter case, please
update the patch with the new commit hash after doing a final
release to get those changes out so we know to proceed with the
transition.
Change-Id: Ic6d4b4841862b8bbc5a9a5e5b28dbdc39de16970
In preparation for EM of stable/ussuri, do a final release of
any TripleO projects which have had commits since the last release
(excluding tripleo-validations since it is already marked extended
maintenance for ussuri).
Signed-off-by: James Slagle <jslagle@redhat.com>
Depends-On: I222d8e83a965f1213c244b878e995ed2d47032a5
Change-Id: I7c66d9ff20ecb22eb3d1436155ba7758f7a3670e
Related puppet-tripleo metadata bump in depends-on is required
before validation will pass here as we are tagging that commit.
Some of these would warrant a bump to .feature rather than .patch
however we are locked to .patch on some of these for ussuri because
of an error made in an earlier (victoria) release.
Depends-On: Ia4aa0c87c1594f8e53c24a86d874998c561af931
Change-Id: Ied1c09bf9f6d22d9de7728ad4dfdff89e73f9ae0
Related puppet-tripleo metadata bump merged at [1]. Some of these
Some of these would warrant a bump to .feature rather than .patch
however we are locked to .patch on some of these for ussuri because
of an error made in an earlier (victoria) release.
[1] https://review.opendev.org/c/openstack/puppet-tripleo/+/795588
Change-Id: If0eb0b199288555fc58760f74a7afaa4da3d3828
Cycle-trailing deliverables are regular cycle-following deliverables,
using RCs or not not using RCs -- they just have a different deadline.
Rather than using a release model, those deadline variants are better
described using deliverable types, in much the same way 'library'
deliverables have a specific deadline too.
This simplifies the list of models significantly, and allows to have
proposer validation of trailing deliverables that use RCs or not use
RCs.
For compatibility in old branches, setting 'cycle-trailing' is still
supported, it will just overload the type to 'trailing' if specified.
Change-Id: Ifce88ef3e5dd406f45f25214699f16e736ad5377
First updated release tags for the Ussuri cycle.
Bump to allow for updated dependencies.
Co-Authored-By: Wes Hayutin <weshayutin@gmail.com>
Co-Authored-By: Emilien Macchi <emilien@redhat.com>
Change-Id: I02e38bcf10b8eea56bb40511868d862f3db70bbc
Adds deliverable stubs based on what was released in Train.
Change-Id: Iab182666ea65cdb7ea7e023853b18eaa9c57403b
Signed-off-by: Sean McGinnis <sean.mcginnis@gmail.com>