Currently, the index page for the Train releases doesn't include a link
to the release notes for the keystone entry[1]. Keystone does have
release notes for Train, so include the link the way other projects do.
[1] https://releases.openstack.org/train/index.html#keystone
Change-Id: I3119445e6d44885763328a555dab317bd5142308
These are the final release taggings for all cycle-with-rc projects.
While not required, having PTLs ack this patch would be nice to include
that record in the merged metadata.
Since it always comes up - yes, the diff-start is right. That's the
calculated starting point where the last stable branch was created.
Change-Id: Icd4d3e6bc2bdd23b7073c38ea1a2e9100e679834
Signed-off-by: Sean McGinnis <sean.mcginnis@gmail.com>
Adds deliverable stubs based on what was released in Stein.
Change-Id: I029b32a3ff8a74a3ffaf7b61b57147e6812ff223
Signed-off-by: Sean McGinnis <sean.mcginnis@gmail.com>