ea8af7f94a
Proposing release for cycle-with-intermediary deliverables that have not released yet. If you wants to wait for a specific patch to make it to the release, someone from your team can -1 the patch to have it held, or update that patch with a different commit SHA. Patches with no response will be merged by Friday March 26. $ git log --oneline --no-merges 2.1.1..1ec7859 1ec7859 Add bifrost job and update docs 198f07d Reconfigure tox.ini 36f2ccb Remove lower-constraints job c5d4ea9 Set safe version of hacking e33f2e7 Add Python3 wallaby unit tests 0f9da06 Migrate IPE job to focal 8d25757 Update master for stable/victoria Signed-off-by: Armstrong Foundjem <foundjem@ieee.org> Change-Id: Ib12dbbb007c93497776623a4c4b6d79249376a2a
17 lines
423 B
YAML
17 lines
423 B
YAML
---
|
|
storyboard: openstack/ironic-prometheus-exporter
|
|
release-model: cycle-with-intermediary
|
|
stable-branch-type: std-with-versions
|
|
team: ironic
|
|
type: other
|
|
repository-settings:
|
|
openstack/ironic-prometheus-exporter: {}
|
|
releases:
|
|
- version: 2.2.0
|
|
projects:
|
|
- repo: openstack/ironic-prometheus-exporter
|
|
hash: 1ec78598b3d0ea7f2a51db8a854fd73744a66a8c
|
|
branches:
|
|
- name: stable/wallaby
|
|
location: 2.2.0
|