a80a4d898b
Deliverables following the cycle-with-intermediary model are expected to release multiple times throughout the development cycle. Since Adjutant only released once last cycle, and has not done a release yet this cycle, this proposes changing the release model to cycle-with-rc so the expectation is only that it will release an RC by the end of the cycle prior to doing the final release. This is just a suggestion for the team to consider. The important point is past the milestone-2 point, downstream planning starts happening for what will be included in the release. We just want to try to avoid the situation where downstream expects something to be included, but we need to unexpectedly drop it from the coordinated release late in the cycle. For the team, please respond to this patch in one of the following ways: * -1 this patch and follow up with an intermediary release * +1 this patch and we will switch over the release model * -1 this patch, but acknowledge a release will be done prior to the RC1 deadline. Change-Id: Idea391efe6031ce90c0af386b63979ff27845988 Signed-off-by: Sean McGinnis <sean.mcginnis@gmail.com>
9 lines
174 B
YAML
9 lines
174 B
YAML
---
|
|
storyboard: openstack/adjutant-ui
|
|
release-model: cycle-with-rc
|
|
team: adjutant
|
|
release-type: horizon
|
|
type: horizon-plugin
|
|
repository-settings:
|
|
openstack/adjutant-ui: {}
|