
This is a proposed release schedule for OpenStack 2025.1 Epoxy. 26 weeks long cycle, with 2 April, 2025 as planned release date. Change-Id: I71dc9a7593260180db0a01b722fe38271bbd0acd
This is a proposed release schedule for OpenStack 2025.1 Epoxy. 26 weeks long cycle, with 2 April, 2025 as planned release date. Change-Id: I71dc9a7593260180db0a01b722fe38271bbd0acd