86a537ba23
These are the final release taggings for all cycle-with-rc projects. While not required, having PTLs ack this patch would be nice to include that record in the merged metadata. Since it always comes up - yes, the diff-start is right. That's the calculated starting point where the last stable branch was created. Change-Id: Icd4d3e6bc2bdd23b7073c38ea1a2e9100e679834 Signed-off-by: Sean McGinnis <sean.mcginnis@gmail.com>
21 lines
465 B
YAML
21 lines
465 B
YAML
---
|
|
launchpad: barbican
|
|
release-model: cycle-with-rc
|
|
team: barbican
|
|
type: service
|
|
repository-settings:
|
|
openstack/barbican: {}
|
|
releases:
|
|
- version: 9.0.0.0rc1
|
|
projects:
|
|
- repo: openstack/barbican
|
|
hash: 2a6fc155d232763a44ebe886f70fdde2a0030a62
|
|
- version: 9.0.0
|
|
projects:
|
|
- repo: openstack/barbican
|
|
hash: 2a6fc155d232763a44ebe886f70fdde2a0030a62
|
|
diff-start: 8.0.0
|
|
branches:
|
|
- name: stable/train
|
|
location: 9.0.0.0rc1
|