releases/deliverables/ussuri/freezer-web-ui.yaml
Sean McGinnis 85f5bfb0cc
Switch freezer to cycle-with-rc
Deliverables following the cycle-with-intermediary model are expected
to release multiple times throughout the development cycle. Since
freezer only released once last cycle, and has not done a release
yet this cycle, this proposes changing the release model to cycle-with-rc
so the expectation is only that it will release an RC by the end of
the cycle prior to doing the final release.

For the team, please respond to this patch in one of the following ways:

* -1 this patch and follow up with an intermediary release
* +1 this patch and we will switch over the release model
* -1 this patch, but acknowledge a release will be done prior to the
  RC1 deadline.

Change-Id: I7d71b912d31c424f167b89e8a7ceee57eb4c0a01
Signed-off-by: Sean McGinnis <sean.mcginnis@gmail.com>
2020-02-25 15:47:58 -06:00

9 lines
181 B
YAML

---
include-pypi-link: true
storyboard: openstack/freezer-web-ui
release-model: cycle-with-rc
team: freezer
type: horizon-plugin
repository-settings:
openstack/freezer-web-ui: {}