As a courtesy for project teams, on RC1 week the release management team proposes a RC1 release for all cycle-with-rc deliverables, based on HEAD. That RC1 will double as the branch point for the stable/victoria branch for trove-dashboard. Release liaison or PTL should +1 this proposal if they are happy with it, amend this proposal (for example with a more recent SHA) to match their needs, or -1 to block it until release-critical issues are all fixed. Change-Id: I715e39a431c49211971964ca9f5f8c14c93ecc21 Signed-off-by: Thierry Carrez <thierry@openstack.org>
16 lines
352 B
YAML
16 lines
352 B
YAML
---
|
|
launchpad: trove-dashboard
|
|
release-model: cycle-with-rc
|
|
team: trove
|
|
type: horizon-plugin
|
|
repository-settings:
|
|
openstack/trove-dashboard: {}
|
|
releases:
|
|
- version: 15.0.0.0rc1
|
|
projects:
|
|
- repo: openstack/trove-dashboard
|
|
hash: 2ce3da5b3080146d3aa00aa7d583a477017ed7ba
|
|
branches:
|
|
- name: stable/victoria
|
|
location: 15.0.0.0rc1
|