86a537ba23
These are the final release taggings for all cycle-with-rc projects. While not required, having PTLs ack this patch would be nice to include that record in the merged metadata. Since it always comes up - yes, the diff-start is right. That's the calculated starting point where the last stable branch was created. Change-Id: Icd4d3e6bc2bdd23b7073c38ea1a2e9100e679834 Signed-off-by: Sean McGinnis <sean.mcginnis@gmail.com>
23 lines
609 B
YAML
23 lines
609 B
YAML
---
|
|
launchpad: masakari
|
|
release-model: cycle-with-rc
|
|
team: masakari
|
|
type: horizon-plugin
|
|
release-type: horizon
|
|
repository-settings:
|
|
openstack/masakari-dashboard: {}
|
|
releases:
|
|
- version: 1.0.0.0rc1
|
|
projects:
|
|
- repo: openstack/masakari-dashboard
|
|
hash: 51c88683a4b68f8ce77de0000eafa4eedea560f6
|
|
- version: 1.0.0
|
|
projects:
|
|
- repo: openstack/masakari-dashboard
|
|
hash: 51c88683a4b68f8ce77de0000eafa4eedea560f6
|
|
diff-start: 0.3.0
|
|
branches:
|
|
- name: stable/train
|
|
location: 1.0.0.0rc1
|
|
release-notes: https://docs.openstack.org/releasenotes/masakari-dashboard/train.html
|