releases/deliverables/train/panko.yaml
Sean McGinnis 86a537ba23
Train final releases for cycle-with-rc projects
These are the final release taggings for all cycle-with-rc projects.
While not required, having PTLs ack this patch would be nice to include
that record in the merged metadata.

Since it always comes up - yes, the diff-start is right. That's the
calculated starting point where the last stable branch was created.

Change-Id: Icd4d3e6bc2bdd23b7073c38ea1a2e9100e679834
Signed-off-by: Sean McGinnis <sean.mcginnis@gmail.com>
2019-10-15 08:40:58 -05:00

22 lines
526 B
YAML

---
launchpad: panko
release-model: cycle-with-rc
team: Telemetry
type: service
repository-settings:
openstack/panko: {}
releases:
- version: 7.0.0.0rc1
projects:
- repo: openstack/panko
hash: 92a0a825e5771a03c81069c5a19a6fc8adfbec15
- version: 7.0.0
projects:
- repo: openstack/panko
hash: 92a0a825e5771a03c81069c5a19a6fc8adfbec15
diff-start: 6.0.0
branches:
- name: stable/train
location: 7.0.0.0rc1
release-notes: https://docs.openstack.org/releasenotes/panko/train.html