e2ac5c649a
If you wants to wait for a specific patch to make it to the release, someone from your team can -1 the patch to have it held, or update that patch with a different commit SHA. Patches with no response will be merged by Friday March 26. $ git log --oneline --no-merges 11.0.0..6b6d90c3 948e88c2 [goal] Deprecate the JSON formatted policy file 8a457497 Imported Translations from Zanata 656b9373 requirements: Drop os-testr d949c970 Use unittest.mock instead of third party mock 0c7e97bd Fix hacking min version to 3.0.1 bf086eb7 update lower constraints 772db810 [Part1] Remove six 20fabeb0 Fix the issue that the subscription api always returns unconfirmed 37255986 Fix the messages get bug 0e435a35 Add releasenotes for victoria f52643dc Update master for stable/victoria Signed-off-by: Hervé Beraud <hberaud@redhat.com> Change-Id: If86737cae2540968086854a5a56abcbfed0e0da4
16 lines
314 B
YAML
16 lines
314 B
YAML
---
|
|
launchpad: zaqar
|
|
release-model: cycle-with-rc
|
|
team: zaqar
|
|
type: service
|
|
repository-settings:
|
|
openstack/zaqar: {}
|
|
releases:
|
|
- version: 12.0.0.0rc1
|
|
projects:
|
|
- repo: openstack/zaqar
|
|
hash: 6b6d90c3b7eb0ee9892abc31565a6e0fc99bef4f
|
|
branches:
|
|
- name: stable/wallaby
|
|
location: 12.0.0.0rc1
|