25a08d003e
Deliverables following the cycle-with-intermediary model are expected to release multiple times throughout the development cycle. Since monasca-* only released once last cycle, and has not done a release yet this cycle, this proposes changing the release model to cycle-with-rc so the expectation is only that it will release an RC by the end of the cycle prior to doing the final release. For the team, please respond to this patch in one of the following ways: * -1 this patch and follow up with an intermediary release * +1 this patch and we will switch over the release model * -1 this patch, but acknowledge a release will be done prior to the RC1 deadline. Change-Id: I0779e84405efc6447dcf76aaa1f9450244d4833a Signed-off-by: Sean McGinnis <sean.mcginnis@gmail.com>
8 lines
133 B
YAML
8 lines
133 B
YAML
---
|
|
launchpad: monasca
|
|
release-model: cycle-with-rc
|
|
team: monasca
|
|
type: other
|
|
repository-settings:
|
|
openstack/monasca-persister: {}
|