Updates on upgrade docs (r5, r6, r7, r8, d6, d7, ds8)

Change-Id: I077cfcd52372edcf2e2147ce1054e9428c15dd17
Signed-off-by: Ngairangbam Mili <ngairangbam.mili@windriver.com>
This commit is contained in:
Ngairangbam Mili 2023-09-21 04:54:39 +00:00
parent 42a026b68a
commit 95ee94bb2f
3 changed files with 21 additions and 31 deletions

View File

@ -37,7 +37,7 @@ follows:
.. rubric:: |prereq|
For all deployment configurations, end user container images in
For |AIO-SX| deployment configurations, the end user container images in
`registry.local` will be backed up during the upgrade process. This only
includes images other than |prod| system and application images. These images
are limited to 5 GB in total size. If the system contains more than 5 GB of
@ -68,16 +68,18 @@ The following prerequisites apply to a |prod-dc| upgrade management service.
- Run the :command:`kubectl get pods --all-namespaces` command to test
that the authentication token validates correctly.
- Run the :command:`fm alarm-list` command to check the system health to
ensure that there are no unexpected or management-affecting alarms.
- Run the :command:`fm alarm-list` command to ensure that there are no
unexpected or management-affecting alarms.
- Run the :command:`system health-query-upgrade` command to check the
system health to ensure that the system meets all the upgrade prerequisites.
- Run the :command:`kubectl get host -n deployment` command to ensure all
nodes in the cluster have reconciled and is set to 'true'.
- Ensure **controller-0** is the active controller.
- The subclouds must all be |AIO-SX|, and must use the Redfish
platform management service.
- The |AIO-SX| subclouds must use the Redfish platform management service.
- Ensure any certificates managed by cert manager will not be renewed during
the upgrade process.

View File

@ -165,12 +165,11 @@ Follow the steps below to manually upgrade the System Controller:
Use the command :command:`system upgrade-start --force` to force the
upgrades process to start and to ignore management affecting alarms.
This should ONLY be done if these alarms do not cause an issue for the
This should only be done if these alarms do not cause an issue for the
upgrades process.
The `fm alarm-list` will provide the specific alarms leading to the system
health-query-upgrade alarms notes which may be blocking an orchestrated
upgrade.
The ``fm alarm-list --mgmt_affecting`` option provides specific alarms
which may be blocking an orchestrated upgrade.
On systems with Ceph storage, it also checks that the Ceph cluster is
healthy.
@ -241,9 +240,8 @@ Follow the steps below to manually upgrade the System Controller:
.. note::
Do not unlock controller-1, before running :command:`system
upgrade-show` to display the upgrade status
"data-migration-complete".
Do not unlock controller-1, before running the :command:`system upgrade-show`
command to display the upgrade status **data-migration-complete** or **upgrading-controllers**.
#. Unlock controller-1.
@ -254,18 +252,11 @@ Follow the steps below to manually upgrade the System Controller:
Wait for controller-1 to become **unlocked-enabled**. Wait for the DRBD
sync **400.001** Services-related alarm is raised and then cleared.
The following states apply when this command is executed.
- upgrading-controllers:
- State entered when controller-1 has been unlocked and is
running release nn.nn software.
where *nn.nn* in the update file name is the |prod| release
number.
The **upgrading-controllers** state applies when this command is
run. This state is entered after controller-1 has been upgraded to
release nn.nn and data migration is successfully completed.
where *nn.nn* in the update file name is the |prod| release number.
If it transitions to **unlocked-disabled-failed**, check the issue
before proceeding to the next step. The alarms may indicate a
@ -273,8 +264,8 @@ Follow the steps below to manually upgrade the System Controller:
controller-1, (for example, Error logs in
controller1:``/var/log/puppet``).
#. Run the :command:`system application-list`, and :command:`system
host-upgrade-list` commands to view the current progress.
#. Run the :command:`system application-list` and :command:`system host-upgrade-list`
commands to view the current progress.
#. Set controller-1 as the active controller. Swact to controller-1.

View File

@ -312,12 +312,9 @@ of |prod| software.
the |DRBD| sync **400.001** Services-related alarm to be raised and then
cleared.
The following states apply when this command is executed.
- ``upgrading-controllers``:
- State entered when controller-1 has been unlocked and is
running release nn.nn software.
The **upgrading-controllers** state applies when this command is executed.
This state is entered after controller-1 has been upgraded to release nn.nn
and data migration is successfully completed.
If the controller transitions to **unlocked-disabled-failed**, check the
issue before proceeding to the next step. The alarms may indicate a