Distributed Cloud Upgrades
Added new content to DC guide
List of impacted topics:
-Upgrade Management Overview
-Upgrading the SystemController Using the CLI
-Distributed Upgrade Orchestration Process Using the CLI
-Robust Error Handling During An Orchestrated Upgrade
-Failure Prior to the installation of N+1 Load on a Subcloud
-Failure During the Installation or Data Migration of N+1 Load on a Subcloud
- Removed section-> Failure Caused by Invalid Docker Registry Certificate
Story: TBD
Task: TBD
Signed-off-by: Adil <mohamed.adilassakkali@windriver.com>
Change-Id: I8538dd6bda8651d76964f64c250df627bace75cb
This commit is contained in:
committed by
Mohamed Adil Assakkali
parent
5b39d5781a
commit
cfa6850d84
@@ -6,9 +6,8 @@
|
||||
Distributed Upgrade Orchestration Process Using the CLI
|
||||
=======================================================
|
||||
|
||||
Distributed upgrade orchestration can be initiated after the upgrade and
|
||||
stability of the System Controller cloud. Distributed upgrade orchestration can
|
||||
be initiated after the system controller has been successfully upgraded.
|
||||
Distributed upgrade orchestration can be initiated after the System Controller
|
||||
has been successfully upgraded.
|
||||
|
||||
.. rubric:: |context|
|
||||
|
||||
@@ -26,7 +25,7 @@ using parameters to specify:
|
||||
|
||||
|
||||
Based on these parameters, and the state of the subclouds, the upgrade
|
||||
orchestrator creates a number of stages for the overall upgrade strategy. All
|
||||
orchestration creates a number of stages for the overall upgrade strategy. All
|
||||
the subclouds that are included in the same stage will be upgraded in parallel.
|
||||
|
||||
.. rubric:: |prereq|
|
||||
|
||||
@@ -21,7 +21,7 @@ Errors can occur due to one of the following:
|
||||
|
||||
- One or more invalid install values
|
||||
|
||||
- A network error that results in the subcloud's being temporarily unreachable
|
||||
- A network error that results in the subcloud being temporarily unreachable
|
||||
|
||||
|
||||
**Failure Caused by Install Values**
|
||||
|
||||
@@ -73,11 +73,10 @@ The following prerequisites apply to a |prod-dc| upgrade management service.
|
||||
|
||||
- Use the :command:`system application-remove` and :command:`system
|
||||
application-delete` commands to remove the application on the
|
||||
subclouds.
|
||||
|
||||
- Remove any non-GA applications and
|
||||
|prefix|-openstack, from the |prod-dc| system, if they exist.
|
||||
subclouds:
|
||||
|
||||
- Remove any non-GA and |prefix|-openstack applications, from the
|
||||
|prod-dc| system, if they exist.
|
||||
|
||||
.. only:: partner
|
||||
|
||||
|
||||
Reference in New Issue
Block a user