Multiple PodManager Scheduler
|
||||
=============================
|
||||
|
||||
This proposal describes adding new scheduler service into valence to determine
|
||||
how to dispatch compose operation to the appropriate Pod manager.
|
||||
|
||||
https://blueprints.launchpad.net/openstack-valence/+spec/valence-multipodm-scheduler
|
||||
|
||||
Problem description
|
||||
===================
|
||||
|
||||
Valence will support multiple Pod managers on the backend instead of one single
|
||||
instance to improve its scalability. It requires valence to provide a scheduling
|
||||
service to determine how to dispatch each compose operations on the appropriate
|
||||
Pod manager. The scheduler should filter out the inappropriate Pod Manager
|
||||
without requested hardware resource and rank the priority for the remaining Pod
|
||||
manager with different algorithms. For different scheduling goal, it should
|
||||
allow admin to plugin new algorithms.
|
||||
|
||||
Proposed change
|
||||
===============
|
||||
|
||||
The valence scheduler runs as a separate process alongside the other valence
|
||||
services such as the API server. Its interface to the API server is accepting
|
||||
the request proprieties of each compose operation, and it does a posts to
|
||||
controller to indicate where the composition should be scheduled.
|
||||
|
||||
The scheduler is divided into two layers from high level:
|
||||
- Scheduler framework:
|
||||
The main() entry that does service initialization and calls the scheduler
|
||||
algorithm.
|
||||
- Scheduling algorithm:
|
||||
The scheduling algorithm that assigns target Pod manager for each compose
|
||||
operation.
|
||||
|
||||
The Scheduler tries to find a PODM for each compose operation, one at a time.
|
||||
- First it applies a set of "filter functions" to filter out inappropriate
|
||||
nodes. If the compose operation specifies resource requests, then the scheduler
|
||||
will filter out PODM that don't have at least that much resources available.
|
||||
- Second, it applies a set of "priority functions" that rank the PODM that
|
||||
weren't filtered out in the first step. The "priority functions" may vary for
|
||||
different scenarios. For example, it tries to spread all composed node across
|
||||
all PODM.
|
||||
- Finally, the PODM with the highest priority is chosen. If there are multiple
|
||||
such PODM, then one of them is chosen at random.
|
||||
|
||||
For given compose operations::
|
||||
|
||||
+---------------------------------------------+
|
||||
| Schedulable PODM: |
|
||||
| |
|
||||
| +--------+ +--------+ +--------+ |
|
||||
| | PODM 1 | | PODM 2 | | PODM 3 | |
|
||||
| +--------+ +--------+ +--------+ |
|
||||
| |
|
||||
+-------------------+-------------------------+
|
||||
|
|
||||
|
|
||||
v
|
||||
+-------------------+-------------------------+
|
||||
Filters function: PODM 3 doesn't have enough
|
||||
resource
|
||||
+-------------------+-------------------------+
|
||||
|
|
||||
|
|
||||
v
|
||||
+-------------------+-------------------------+
|
||||
| remaining PODM: |
|
||||
| +--------+ +--------+ |
|
||||
| | PODM 1 | | PODM 2 | |
|
||||
| +--------+ +--------+ |
|
||||
| |
|
||||
+-------------------+-------------------------+
|
||||
|
|
||||
|
|
||||
v
|
||||
+-------------------+-------------------------+
|
||||
Priority function: PODM 1: p=5
|
||||
PODM 2: p=3
|
||||
+-------------------+-------------------------+
|
||||
|
|
||||
|
|
||||
v
|
||||
select max{PODM priority} = PODM 1
|
||||
|
||||
Both filters function and Priority function should be configurable to allow
|
||||
admin to choose proper algorithm for different scenarios, like disable all
|
||||
algorithms and let scheduler randomly choose one.
|
||||
|
||||
Alternatives
|
||||
------------
|
||||
|
||||
Make scheduler as a valence module instead of standalone service. This solution
|
||||
will be more simple but tight couple with other services, which will bring more
|
||||
overhead if scheduler service need to be upgraded or restarted.
|
||||
|
||||
Data model impact
|
||||
-----------------
|
||||
None
|
||||
|
||||
REST API impact
|
||||
---------------
|
||||
Be default, scheduler will determine the target POD manager for each compose
|
||||
operation. However, valence should also allow user to specify the target POD
|
||||
manager. So a new parameter is needed for node composition request.
|
||||
|
||||
```
|
||||
/v1/nodes/:
|
||||
POST : add a new param to let user specify a POD manager for compose operation.
|
||||
```
|
||||
|
||||
Driver API impact
|
||||
-----------------
|
||||
None
|
||||
|
||||
Security impact
|
||||
---------------
|
||||
None
|
||||
|
||||
Other end user impact
|
||||
---------------------
|
||||
User can specify the target POD manager for compose operation if needed.
|
||||
|
||||
Scalability impact
|
||||
------------------
|
||||
The valence scalability will be significantly improved by supporting dispatch
|
||||
compose operations on multiple POD manager.
|
||||
|
||||
Performance Impact
|
||||
------------------
|
||||
The scheduler will bring more complexity and overhead, which might add
|
||||
latency into valence response one compose operation. Given the compose
|
||||
operations on the data center will not be so frequently as launch VM/continer,
|
||||
so the scheduler will not be the performance bottleneck in the current stage.
|
||||
|
||||
Other deployer impact
|
||||
---------------------
|
||||
The admin should deploy and start scheduler process alongside other valence
|
||||
services.
|
||||
|
||||
Developer impact
|
||||
----------------
|
||||
None
|
||||
|
||||
Valence GUI / Horizon impact
|
||||
----------------------------
|
||||
None
|
||||
|
||||
Implementation
|
||||
==============
|
||||
Assignee(s)
|
||||
-----------
|
||||
Primary assignee:
|
||||
Lin Yang
|
||||
|
||||
Work Items
|
||||
----------
|
||||
* Implement the framework of scheduler service.
|
||||
* Implement the default algorithms for both filter and priority steps.
|
||||
* Add unit tests.
|
||||
|
||||
Dependencies
|
||||
============
|
||||
None
|
||||
|
||||
Testing
|
||||
=======
|
||||
* Add unit tests for service framework and scheduling algorithms.
|
||||
|
||||
Documentation Impact
|
||||
====================
|
||||
None
|
||||
|
||||
References
|
||||
==========
|
||||
None
|
Loading…
x
Reference in New Issue
Block a user