Addresses some issues with this command: 1) When used without the --max-count option, the summary table will always show zero migrations run, because it only accounts for the last batch, and the loop only exits when the last batch does no work. 2) "remaining" counts cannot be accurate, given the way migrations are implemented, because the "found" count refers to the number of rows that exist in the database, not the number that still need the migration applied. 3) In the case where no migrations are successful, but some raise exceptions, the command was exiting with status zero, which usually indicates "success". This can cause issues that cause migration failures to go unnoticed, especially when automated. 4) When exceptions do occur, a minimally useful message is output, and no detail about the exception is available to the user. The exception detail should be logged. 5) Inaccuracies in the documentation - "--max_number" should be "--max-count", and stale references to the "--ignore_state" option, which was removed in [1] The solution for (3) introduces a new exit status, 2. See release note for details. These changes are aligned with equivalents [2][3] for the nova-manage command, except for the calculation of "Total Needed" - nova seems to interpret the "found" count differently/inconsistently. [1] https://review.openstack.org/510201 [2] https://review.openstack.org/605828 [3] https://review.openstack.org/608091 Change-Id: I878480eb2359625cde839b073230844acc645cba Closes-Bug: #1794364 Closes-Bug: #1796192
11 KiB
Upgrades
Cinder aims to provide upgrades with minimal downtime.
This should be achieved for both data and control plane. As Cinder doesn't interfere with data plane, its upgrade shouldn't affect any volumes being accessed by virtual machines.
Keeping the control plane running during an upgrade is more difficult. This document's goal is to provide preliminaries and a detailed procedure of such upgrade.
Concepts
Here are the key concepts you need to know before reading the section on the upgrade process:
RPC version pinning
Through careful RPC versioning, newer services are able to talk to
older services (and vice-versa). The versions are autodetected using
information reported in services
table. In case of
receiving CappedVersionUnknown
or
ServiceTooOld
exceptions on service start, you're probably
having some old orphaned records in that table.
Graceful service shutdown
Many cinder services are python processes listening for messages on an AMQP queue. When the operator sends SIGTERM signal to the process, it stops getting new work from its queue, completes any outstanding work and then terminates. During this process, messages can be left on the queue for when the python process starts back up. This gives us a way to shutdown a service using older code, and start up a service using newer code with minimal impact.
Note
Waiting for completion of long-running operations (e.g. slow volume copy operation) may take a while.
Note
This was tested with RabbitMQ messaging backend and may vary with other backends.
Online Data Migrations
To make DB schema migrations less painful to execute, since Liberty,
all data migrations are banned from schema migration scripts. Instead,
the migrations should be done by background process in a manner that
doesn't interrupt running services (you can also execute online data
migrations with services turned off if you're doing a cold upgrade). In
Ocata a new cinder-manage db online_data_migrations
utility
was added for that purpose. Before upgrading Ocata to Pike, you need to
run this tool in the background, until it tells you no more migrations
are needed. Note that you won't be able to apply Pike's schema
migrations before completing Ocata's online data migrations.
API load balancer draining
When upgrading API nodes, you can make your load balancer only send new connections to the newer API nodes, allowing for a seamless update of your API nodes.
DB prune deleted rows
Currently resources are soft deleted in the database, so users are
able to track instances in the DB that are created and destroyed in
production. However, most people have a data retention policy, of say 30
days or 90 days after which they will want to delete those entries. Not
deleting those entries affects DB performance as indices grow very large
and data migrations take longer as there is more data to migrate. To
make pruning easier there's a
cinder-manage db purge <age_in_days>
command that
permanently deletes records older than specified age.
Versioned object backports
RPC pinning ensures new services can talk to the older service's method signatures. But many of the parameters are objects that may well be too new for the old service to understand. Cinder makes sure to backport an object to a version that it is pinned to before sending.
Minimal Downtime Upgrade Procedure
Plan your upgrade
- Read and ensure you understand the release notes for the next release.
- Make a backup of your database. Cinder does not support downgrading of the database. Hence, in case of upgrade failure, restoring database from backup is the only choice.
- Note that there's an assumption that live upgrade can be performed only between subsequent releases. This means that you cannot upgrade Liberty directly into Newton, you need to upgrade to Mitaka first.
- To avoid dependency hell it is advised to have your Cinder services deployed separately in containers or Python venvs.
- Note that Cinder is basing version detection on what is reported in
the
services
table in the DB. Before upgrade make sure you don't have any orphaned old records there, because these can block starting newer services. You can clean them up usingcinder-manage service remove <binary> <host>
command. - Assumed service upgrade order is cinder-scheduler, cinder-volume, cinder-backup and finally cinder-api.
Rolling upgrade process
To reduce downtime, the services can be upgraded in a rolling fashion. It means upgrading a few services at a time. To minimise downtime you need to have HA Cinder deployment, so at the moment a service is upgraded, you'll keep other service instances running.
Before maintenance window
- First you should execute required DB schema migrations. To achieve
that without interrupting your existing installation, install new Cinder
code in new venv or a container and run the DB sync
(
cinder-manage db sync
). These schema change operations should have minimal or no effect on performance, and should not cause any operations to fail. - At this point, new columns and tables may exist in the database. These DB schema changes are done in a way that both the N and N+1 release can perform operations against the same schema.
During maintenance window
The first service is cinder-scheduler. It is load-balanced by the message queue, so the only thing you need to worry about is to shut it down gracefully (using
SIGTERM
signal) to make sure it will finish all the requests being processed before shutting down. Then you should upgrade the code and restart the service.Repeat first step for all of your cinder-scheduler services.
Then you proceed to upgrade cinder-volume services. The problem here is that due to Active/Passive character of this service, you're unable to run multiple instances of cinder-volume managing a single volume backend. This means that there will be a moment when you won't have any cinder-volume in your deployment and you want that disruption to be as short as possible.
Note
The downtime here is non-disruptive as long as it doesn't exceed the service heartbeat timeout. If you don't exceed that, then cinder-schedulers will not notice that cinder-volume is gone and the message queue will take care of queuing any RPC messages until cinder-volume is back.
To make sure it's achieved, you can either lengthen the timeout by tweaking
service_down_time
value incinder.conf
, or prepare upgraded cinder-volume on another node and do a very quick switch by shutting down older service and starting the new one just after that.Also note that in case of A/P HA configuration you need to make sure both primary and secondary c-vol have the same hostname set (you can override it using
host
option incinder.conf
), so both will be listening on the same message queue and will accept the same messages.Repeat third step for all cinder-volume services.
Now we should proceed with (optional) cinder-backup services. You should upgrade them in the same manner like cinder-scheduler.
Note
Backup operations are time consuming, so shutting down a c-bak service without interrupting ongoing requests can take time. It may be useful to disable the service first using
cinder service-disable
command, so it won't accept new requests, and wait a reasonable amount of time until all the in-progress jobs are completed. Then you can proceed with the upgrade. To make sure the backup service finished all the ongoing requests, you can check the service logs.Note
Until Liberty cinder-backup was tightly coupled with cinder-volume service and needed to coexist on the same physical node. This is not true starting with Mitaka version. If you're still keeping that coupling, then your upgrade strategy for cinder-backup should be more similar to how cinder-volume is upgraded.
cinder-api services should go last. In HA deployment you're typically running them behind a load balancer (e.g. HAProxy), so you need to take one service instance out of the balancer, shut it down, upgrade the code and dependencies, and start the service again. Then you can plug it back into the load balancer.
Note
You may want to start another instance of older c-api to handle the load while you're upgrading your original services.
Then you should repeat step 6 for all of the cinder-api services.
After maintenance window
- Once all services are running the new code, double check in the DB
that there are no old orphaned records in
services
table (Cinder doesn't remove the records when service is gone or service hostname is changed, so you need to take care of that manually; you should be able to distinguish dead records by looking at when the record was updated). Cinder is basing its RPC version detection on that, so stale records can prevent you from going forward. - Now all services are upgraded, we need to send the
SIGHUP
signal, so all the services clear any cached service version data. When a new service starts, it automatically detects which version of the service's RPC protocol to use, and will downgrade any communication to that version. Be advised that cinder-api service doesn't handleSIGHUP
so it needs to be restarted. It's best to restart your cinder-api services as last ones, as that way you make sure API will fail fast when user requests new features on a deployment that's not fully upgraded (new features can fail when RPC messages are backported to lowest common denominator). Order of the rest of the services shouldn't matter. - Now all the services are upgraded, the system is able to use the latest version of the RPC protocol and able to access all the features of the new release.
- At this point, you must also ensure you update the configuration, to stop using any deprecated features or options, and perform any required work to transition to alternative features. All the deprecated options should be supported for one cycle, but should be removed before your next upgrade is performed.
- Since Ocata, you also need to run
cinder-manage db online_data_migrations
command to make sure data migrations are applied. The tool lets you limit the impact of the data migrations by using--max-count
option to limit number of migrations executed in one run. If this option is used, the exit status will be 1 if any migrations were successful (even if others generated errors, which could be due to dependencies between migrations). The command should be rerun while the exit status is 1. If no further migrations are possible, the exit status will be 2 if some migrations are still generating errors, which requires intervention to resolve. The command should be considered completed successfully only when the exit status is 0. You need to complete all of the migrations before starting upgrade to the next version (e.g. you need to complete Ocata's data migrations before proceeding with upgrade to Pike; you won't be able to execute Pike's DB schema migrations before completing Ocata's data migrations).