Go to file
Joshua Harlow d746a93171 Make connection/validation of tasks be after they are added.
Instead of having validation be immediate when tasks are added
to the linear flow, follow the same paradigm as the graph_flow
where only upon connection (or determination of the order) will
tasks be connected/validated.

Change-Id: Ia8275ec88b0229f0793819249ae59fad0a2e9935
2013-07-06 12:14:00 -07:00
2013-06-28 16:06:10 -07:00
2013-05-07 10:49:44 -07:00
2013-06-27 11:00:05 -07:00
2013-05-29 15:16:40 -07:00
2013-06-26 11:04:42 +10:00

TaskFlow

A library to do [jobs, tasks, flows] in a HA manner using different backends to be used with OpenStack projects.

Join us

Description
RETIRED, further work has moved to Debian project infrastructure
Readme 4.8 MiB