House rules for governance changes approval
=============================================
While most of the governance changes follow the rules described in the
:ref:`charter-motions-section` section and call for a formal discussion and vote
by the Technical Committee membership, we also have a number of exceptions to
that general rule, in order to speed up the processing of smaller changes. This
document lists those "house rules" for reference.
Typo fixes
----------
When the change fixes content that is obviously wrong (updates a PTL email
address, fixes a typo...) then the chair is allowed to directly approve them.
Typo fixes proposed by the chair should have 2 RollCall+1 votes from TC members.
Code changes
------------
The `openstack/governance` repository also contains code to build and publish
pages on the governance.openstack.org website. For those we apply the normal
code review rules (with RollCall votes being considered +-2): change will be
approved once 2 `RollCall+1` (other than the change owner) are posted (and no
`RollCall-1`).
Delegated tags
--------------
Some tags are delegated to a specific team, like
:ref:`tag-stable:follows-policy`
or :ref:`tag-vulnerability:managed`. Those need to get approved by the
corresponding team PTL, and can be directly approved by the chair once this
approval is given.
Other project team updates
--------------------------
For other changes within an existing project team, like addition of a new git
repository or self-assertion of a tag, we use lazy consensus. If there is no
objection posted one week after the change is proposed (or a significant new
revision of the change is posted), then the change can be approved by the
chair.
One exception to this would be significant team mission statement changes,
which should be approved by a formal vote after discussion on the mailing list
or the gerrit change.
In corner cases where the change is time-sensitive (like a deliverable
reorganization which blocks a release request), the chair may fast-track the
change, but should report on that exception in the TC update.
Goal Updates from PTLs
----------------------
PTLs will acknowledge community-wide goals at the start of each cycle
by providing links to artifacts for tracking the work, or an
explanation of why work is not going to be done. They will also
provide references to completion artifacts at the end of each cycle
for goals where work was needed. These patches should be reviewed by
TC members for completeness and clarity (is enough information
provided for interested parties to track the work, or is the
justification for not doing work clear enough).
The patches to add team acknowledgments, planning artifacts, and
completion artifacts to the goal document do not need to go through
the formal vote process, and so lazy consensus rules will be used. If
there is no objection posted one week after the most recent version of
a change is proposed, then the change can be approved by the chair.
If a TC member feels that one of these responses needs to be discussed
by the entire TC, they should bring it up on the mailing list and the change
should not be approved until after the discussion is completed.
Appointing PTLs
---------------
In a resolution regarding :ref:`leaderless programs`, the TC was granted
authority to appoint a Project Team Lead to any official project where the
`election`_ process failed to produce a leader. When this happens,
``reference/projects.yaml`` in the ``governance`` repository should be updated
to indicate the new PTL and their appointment by adding their name and contact
details and updating an ``appointed`` key with the cycle during which they will
be the PTL. If the ``appointed`` key is already present, add the cycle to the
list. If the key is not present, add it and set the cycle as a single member of
a list. This format is used for two reasons: to track all the cycles for which
there has been an appointment and to require a comprehensible change for review
by the TC. The ``appointed`` key should only be changed when the PTL was not
chosen by the election process.
These changes are subject to the standard review and approval guidelines.
Rolling back fast-tracked changes
---------------------------------
As a safety net, if any member disagrees with any change that was fast-tracked
under one of those house rules, that member can propose a revert of the
change. Such revert should be directly approved by the chair and the change
be discussed on the mailing list or on the re-proposed change in gerrit.
.. _election: http://docs.openstack.org/project-team-guide/open-community.html#technical-committee-and-ptl-elections