Scheduling interaction for cells
https://blueprints.launchpad.net/nova/+spec/cells-scheduling-interaction
In order to schedule instance builds to compute hosts Nova and the scheduler will need to take into account that hosts are grouped into cells. It is not necessary that this is apparent when Nova is requesting a placement decision.
Problem description
In order to partition Nova into cells the scheduler will need to be involved earlier in the build process.
Use Cases
- Operators want to partition their deployments into cells for scaling, failure domain, and buildout reasons. When partitioned, we need to have flexible scheduling that can make decisions on cells and hosts.
Proposed change
The scheduler will be queried at the api level so that it knows which cell to pass the build to. The instance table exists in a cell and not in the api database, so to create an instance we will first need to know which cell to create it in.
The scheduler will continue to return a (host, node) tuple and the calling service will look up the host in a mapping table to determine which cell it is in. This means the current select_destinations interface will not need to change. Querying the scheduler will take place after the API has returned a response so the most reasonable thing to do is pass the build request to a conductor operating outside of any cell. The conductor will call the scheduler and then create the instance in the cell and pass the build request to it.
Rescheduling will still take place within a cell via the normal compute->conductor loop, using the conductors within the cell. Adding rescheduling at a cell level will be a later effort.
Information about cells will need to be fed into the scheduler in order for it to account for that during its placement decisions, but that is outside the scope of this spec.
Alternatives
We could query the scheduler at two points like in cellsv1. This creates more deployment complexity and creates an unnecessary coupling between the architecture of Nova and the scheduler.
Data model impact
None
REST API impact
None
Security impact
None
Notifications impact
None
Other end user impact
None
Performance Impact
None
Other deployer impact
Nova-conductor will need to be deployed for use by nova-api.
Developer impact
None
Implementation
Assignee(s)
- Primary assignee:
-
alaski
- Other contributors:
-
None
Work Items
- Add a conductor method to call the scheduler and then handle the latter half of what the api currently does for a build request(create instance in db and cast to the cell conductor).
- Update the conductor build_instances interface to take a scheduling decision and not call the scheduler if it's provided. This allows for bypassing scheduling when it comes from the api conductor but still call the scheduler when a compute requests a reschedule.
- Update devstack to spin up a conductor for use by the nova-api service.
Dependencies
None
Testing
Since this is designed to be an internal re-architecting of Nova with no user visible changes the current suite of Tempest or functional tests should suffice. At some point we will want to look at how to test multiple cells or potentially exposing the concept of a cell in the API and we will tackle testing requirements then.
Documentation Impact
Documentation will be written describing the flow of an instance build and how and where scheduling decisions are made.
References
https://etherpad.openstack.org/p/kilo-nova-cells
https://etherpad.openstack.org/p/nova-cells-scheduling-requirements
History
| Release Name | Description |
|---|---|
| Liberty | Introduced |
| Mitaka | Re-proposed; partially implemented. |
| Newton | Re-proposed. |