This transition the wallaby branch to extended maintenance.
Changes for bugfixes and things the team deems important are
still encouraged, but there will no longer be official releases
off of the branch.
Please +1 if the team is ready for us to proceed with this
transition, or -1 if there are any final backports currently in
flight that we should wait for. For the latter case, please
update the patch with the new commit hash after doing a final
release to get those changes out so we know to proceed with the
transition.
The transition deadline is November 2nd, 2022.
Change-Id: I3527f89668e8b793fc93d11adcd9183e878fc260
Most of the deadlines (milestones) should be on Thursdays (except the
final release, which is on Wednesday traditionally).
Change-Id: I3cd54fec5abe7ae18796f575241137d8728517ca
This sets the end date for the Zed key, and sets the start for the
2023.1/Antelope key coincident with the merger of the corresponding
I141514eaf31b2249f0901ad1ff93cc1bbe940c2d change.
Change-Id: I65a360d61d28ce4980a6ef7540157e4f67869c72
The blazar-nova deliverable is a library historically released as
cycle-with-intermediary. However, it is not a typical library, since
other OpenStack projects do not depend on it. Rather, it is a Blazar
component loaded into Nova as a scheduler filter.
There is no reason to release it earlier than other Blazar components,
so change the release model to cycle-with-rc.
Change-Id: I699a7f40bb851453527b6af205d4914e6151a3c9
This patch moves devstack and grenade projects' stable/pike branch to
End of Life. These are the last open stable/pike branches (together
with requirements repository) as these need to be transition the last.
Change-Id: If29458bf137e4b0c7affc73e6d62e66cece851b6
The generated content initializes the 2023.1 Antelope cycle's
deliverable files based on Zed deliverables.
Change-Id: I7ed646e43002084aa791483e56046d94762fff75