Magnum team does not have the capacity to backport bugfixes
to those EM branches.
In addition to that, those branches don't allow users to
provision currently supported Kubernetes versions.
queens CI jobs have been last run on Nov2021 and failed
rocky CI jobs have been last run on Nov2021 and failed
stein CI jobs have been last run on Nov2021 and failed
train CI jobs have been last run on Jan2022
ussuri CI jobs have been last run on Nov2021 and failed
Change-Id: I7be823475af8ef5f01cd03cc62854d0d5688c33d
This transition the stein branch to extended maintenance.
Changes for bugfixes and things the team deems important are
still encouraged, but there will no longer be official releases
off of the branch.
Please +1 if the team is ready for us to proceed with this
transition, or -1 if there are any final backports currently in
flight that we should wait for. For the latter case, please
update the patch with the new commit hash after doing a final
release to get those changes out so we know to proceed with the
transition.
Change-Id: I2df9367d6407865171f0e545bd9dd004d8915989
This release picks up new commits to magnum since
the last release from stable/stein.
This is being proposed as a convenience to help make sure stable
changes are being released. If the team is good with this going out,
please respond with a +1 to let the release team know it is OK to
proceed.
If it is not wanted at this time, or if there are more changes that
would be good to get merged before doing a stable release, please
leave a -1 with a comment with what the team would prefer. We can
then either abandon this patch, or wait for an update with a new
commit hash to use instead.
This is not a release team activity, it is just to help out with
stable releases. If there is no response to the patch, we will
assume a release is not needed and abandon the patch after one
week.
Change-Id: If1a7c0237a28680c7608fbdde2edaf686a2eadee
Signed-off-by: Sean McGinnis <sean.mcginnis@gmail.com>
This adds the release note links for the projects that have added their
stein landing pages so far.
Change-Id: I0a49815802a93e8c94845012b98703d24725ecd3
Signed-off-by: Sean McGinnis <sean.mcginnis@gmail.com>
There were several deliverables set as cycle-with-intermediary that have
not been doing intermediary releases. That release model is intended for
deliverables that will be releases multiple times throughout the
development cycle.
With the newer cycle-with-rc release model, teams have the option of not
requiring releases during the cycle and just making sure they are done
near the end of the cycle. See [1] for more details.
This proposes to change this cycle-with-intermediary deliverable to be
cycle-with-rc. Please confirm this is acceptable for the team and feel
free to ask any questions about this change.
[1] http://lists.openstack.org/pipermail/openstack-discuss/2018-December/000465.html
Change-Id: Iee8d9dfc34b3a3e9cbbd8ca749a538172aa1bb2a
Signed-off-by: Sean McGinnis <sean.mcginnis@gmail.com>
Adds deliverable stubs based on what was released in Rocky.
Change-Id: Idf2cd7b396da6e43f31b191f6646cce3749bf680
Signed-off-by: Sean McGinnis <sean.mcginnis@gmail.com>