I think visual representation can help people understand the practical
effects of the SLURP releases on their upgrade options. Lets add one
using graphviz to do the rendering for us.
Change-Id: Ic28c8ad4bc84f094a37b38037a6859d725e85f51
- Clarify that string freezes are applied to I18n target projects
- Fix I18n PTL to I18n SIG per governance change
- Update release liaison for I18n
Change-Id: If256992882a50bebabc3d4873d8512f0f155fc1e
This tags the final release for all cycle-with-rc projects for 2024.2
Dalmatian. While not required, having PTLs ack this patch would be nice
to include that record in the merged metadata.
Release activity should now be frozen until this is processed on
October 2nd. Any bugfixes merged to stable/2024.2 can be queued up and
ready to go as a follow on stable release after the coordinated release
date.
There are different diff-start values for each project. This is used
when generating release notes to denote the point where the
stable/2024.1 branch started to diverge from what is included on
stable/2024.2. For some, this will be the final 2024.1 Caracal major
version, but if multiple RCs were done, this may show the initial RC1
release version. This is normal.
This patch will be merged on October 2nd.
Change-Id: I093fc9dda6d787ead5b40defccddadbf913046ec
If any of your deliverables does not have a release note link added
already under deliverables/dalmatian, then please check whether there is
an open patch on that repository with the topic "reno-2024.2" [1] still
waiting to be approved.
[1] https://review.opendev.org/q/topic:reno-2024.2+is:open
Change-Id: Ie31637fe15c64947b391bc8b5513600f00718f49
This release picks up merged but unreleased changes since the RC1
release for skyline-console.
$ git log --oneline --no-merges 5.0.0.0rc1..HEAD
5501bad7 feat: add Turkish language to the default config
Change-Id: Icd64d7bf7c63b588c5e17d774002fcca93382190
This release picks up merged but unreleased changes since the RC1
release for manila.
$ git log --oneline --no-merges 19.0.0.0rc1..HEAD
620933cdb Fix "preferred" export locations in the CephFS driver
7fd6a54e4 Remove extra policy check
ffa4233b9 Fix export location metadata updates by drivers
5b58f3453 Update TOX_CONSTRAINTS_FILE for stable/2024.2
7fc6b8008 Update .gitreview for stable/2024.2
Change-Id: Ic7a60914dd23ea64f6765050826dc586f0b70570
Kuryr is not being released in Dalmatian, and some of its deliverables
are being transferred to the Zun team for continued maintenance.
Change-Id: I8d36b466b39dd2ed79da2734cec5c1da748ad15a
This proposed a RC1 release for kuryr-libnetwork to get any merged changes
out prior to the RC1 deadline for 2024.2 Dalmatian going into effect.
If the team is ready to proceed, please leave a +1 to acknowledge this
release and we will process right away. If the team is working on any
final merges, leave a -1 with some detail on the status and update the
patch with the new commit hash to use when ready.
Patches with no response will be merged by Friday, September 13th.
Change-Id: I96d2b92754edb56de9b054891bc0d94a833c96d9
Signed-off-by: Elod Illes <elod.illes@est.tech>
If any of your deliverables does not have a release note link added
already under deliverables/dalmatian, then please check whether there is
an open patch on that repository with the topic "reno-2024.2" [1] still
waiting to be approved.
[1] https://review.opendev.org/q/topic:reno-2024.2+is:open
Change-Id: Ifdf3d004d71a938674818940b8050b27bd21f05b
This proposed a RC1 release for zun to get any merged changes
out prior to the RC1 deadline for 2024.2 Dalmatian going into effect.
If the team is ready to proceed, please leave a +1 to acknowledge this
release and we will process right away. If the team is working on any
final merges, leave a -1 with some detail on the status and update the
patch with the new commit hash to use when ready.
Patches with no response will be merged by Friday, September 13th.
Change-Id: If9627feab9099fa2eefa26ff4e59370ffbfe7e46
Signed-off-by: Elod Illes <elod.illes@est.tech>
This proposed a RC1 release for ansible-role-thales-hsm to get any merged changes
out prior to the RC1 deadline for 2024.2 Dalmatian going into effect.
If the team is ready to proceed, please leave a +1 to acknowledge this
release and we will process right away. If the team is working on any
final merges, leave a -1 with some detail on the status and update the
patch with the new commit hash to use when ready.
Patches with no response will be merged by Friday, September 13th.
Change-Id: I97210f28a9b1191326a82096bf223038358d1e89
Signed-off-by: Elod Illes <elod.illes@est.tech>
Create an RC2 patch for neutron as there have been a
few important changes merged to stable/2024.2 since RC1.
$ git log --oneline --no-merges 25.0.0.0rc1..363ffa6e9e
2b42242a69 Correct logic error when associating FIP with OVN LB
962d956269 Handle EndpointNotFound in nova notifier
d2ef2ea1c0 Change the load method of SG rule "default_security_group"
c518b23aa6 Update TOX_CONSTRAINTS_FILE for stable/2024.2
74c155b2cd Update .gitreview for stable/2024.2
Change-Id: I7da59b7a47a8f4b6471a384102867ea23bb58e8d