As a courtesy for project teams, on RC1 week the release management team proposes a RC1 release for all cycle-with-rc deliverables, based on HEAD. That RC1 will double as the branch point for the stable/victoria branch for zaqar-ui. Release liaison or PTL should +1 this proposal if they are happy with it, amend this proposal (for example with a more recent SHA) to match their needs, or -1 to block it until release-critical issues are all fixed. Change-Id: Ia45ca24c932b4bd6282a988069fb7bbab32a417f Signed-off-by: Thierry Carrez <thierry@openstack.org>
17 lines
358 B
YAML
17 lines
358 B
YAML
---
|
|
launchpad: zaqar-ui
|
|
release-model: cycle-with-rc
|
|
release-type: python-service
|
|
team: zaqar
|
|
type: horizon-plugin
|
|
repository-settings:
|
|
openstack/zaqar-ui: {}
|
|
releases:
|
|
- version: 9.0.0.0rc1
|
|
projects:
|
|
- repo: openstack/zaqar-ui
|
|
hash: a5816d9b8766dc3400037078c8a014fead5e7f3a
|
|
branches:
|
|
- name: stable/victoria
|
|
location: 9.0.0.0rc1
|