Proposing victoria RC1 for zaqar-ui
As a courtesy for project teams, on RC1 week the release management team proposes a RC1 release for all cycle-with-rc deliverables, based on HEAD. That RC1 will double as the branch point for the stable/victoria branch for zaqar-ui. Release liaison or PTL should +1 this proposal if they are happy with it, amend this proposal (for example with a more recent SHA) to match their needs, or -1 to block it until release-critical issues are all fixed. Change-Id: Ia45ca24c932b4bd6282a988069fb7bbab32a417f Signed-off-by: Thierry Carrez <thierry@openstack.org>
This commit is contained in:
@@ -6,3 +6,11 @@ team: zaqar
|
||||
type: horizon-plugin
|
||||
repository-settings:
|
||||
openstack/zaqar-ui: {}
|
||||
releases:
|
||||
- version: 9.0.0.0rc1
|
||||
projects:
|
||||
- repo: openstack/zaqar-ui
|
||||
hash: a5816d9b8766dc3400037078c8a014fead5e7f3a
|
||||
branches:
|
||||
- name: stable/victoria
|
||||
location: 9.0.0.0rc1
|
||||
|
||||
Reference in New Issue
Block a user