Software Upgrades
 | 
						|
=================
 | 
						|
 | 
						|
|prod-long| upgrades enable you to move |prod| software from one release of
 | 
						|
|prod| to the next release of |prod|.
 | 
						|
 | 
						|
.. contents:: |minitoc|
 | 
						|
   :local:
 | 
						|
   :depth: 1
 | 
						|
 | 
						|
|prod| software upgrade is a multi-step rolling-upgrade process, where |prod|
 | 
						|
hosts are upgraded one at time while continuing to provide its hosting services
 | 
						|
to its hosted applications. An upgrade can be performed manually or using
 | 
						|
Upgrade Orchestration, which automates much of the upgrade procedure, leaving a
 | 
						|
few manual steps to prevent operator oversight. For more information on manual
 | 
						|
upgrades, see :ref:`Manual Platform Components Upgrade
 | 
						|
<manual-upgrade-overview>`. For more information on upgrade orchestration, see
 | 
						|
:ref:`Orchestrated Platform Component Upgrade
 | 
						|
<orchestration-upgrade-overview>`.
 | 
						|
 | 
						|
.. warning::
 | 
						|
    Do NOT use information in the |updates-doc| guide for |prod-dc|
 | 
						|
    orchestrated software upgrades. If information in this document is used for
 | 
						|
    a |prod-dc| orchestrated upgrade, the upgrade will fail, resulting
 | 
						|
    in an outage. The |prod-dc| Upgrade Orchestrator automates a
 | 
						|
    recursive rolling upgrade of all subclouds and all hosts within the
 | 
						|
    subclouds.
 | 
						|
 | 
						|
.. xbooklink    For more information on the |prod-dc| Upgrade Orchestrator, see,
 | 
						|
    |distcloud-doc|: :ref:`Upgrade Orchestration for Distributed Cloud
 | 
						|
    Subclouds Using CLI
 | 
						|
    <upgrade-orchestration-for-distributed-cloud-subclouds-using-the-cli>`.
 | 
						|
 | 
						|
Before starting the upgrades process:
 | 
						|
 | 
						|
.. _software-upgrades-ul-ant-vgq-gmb:
 | 
						|
 | 
						|
-   The system must be 'patch current'.
 | 
						|
 | 
						|
-   There must be no management-affecting alarms present on the system.
 | 
						|
 | 
						|
-   Ensure that any certificates managed by cert manager will not be renewed
 | 
						|
    during the upgrade process.
 | 
						|
 | 
						|
-   The new software load must be imported.
 | 
						|
 | 
						|
-   A valid license file for the new software release must be installed.
 | 
						|
 | 
						|
The upgrade process starts by upgrading the controllers. The standby controller
 | 
						|
is upgraded first and involves loading the standby controller with the new
 | 
						|
release of software and migrating all the controller services' databases for the
 | 
						|
new release of software. Activity is switched to the upgraded controller,
 | 
						|
running in a 'compatibility' mode where all inter-node messages are using
 | 
						|
message formats from the old release of software. Prior to upgrading the second
 | 
						|
controller, you reach a "point-of-no-return for an in-service abort" of the
 | 
						|
upgrades process. The second controller is loaded with the new release of
 | 
						|
software and becomes the new Standby controller. For more information on manual
 | 
						|
upgrades, see :ref:`Manual Platform Components Upgrade
 | 
						|
<manual-upgrade-overview>` .
 | 
						|
 | 
						|
If present, storage nodes are locked, upgraded and unlocked one at a time in
 | 
						|
order to respect the redundancy model of |prod| storage nodes. Storage nodes
 | 
						|
can be upgraded in parallel if using upgrade orchestration.
 | 
						|
 | 
						|
Worker nodes are then upgraded. Worker nodes are tainted when locked, such that
 | 
						|
Kubernetes shuts down any pods on this worker node and restarts the pods on
 | 
						|
another worker node. When upgrading the worker node, the worker node network
 | 
						|
boots/installs the new software from the active controller. After unlocking the
 | 
						|
worker node, the worker services are running in a 'compatibility' mode where all
 | 
						|
inter-node messages are using message formats from the old release of software.
 | 
						|
Note that the worker nodes can only be upgraded in parallel if using upgrade
 | 
						|
orchestration.
 | 
						|
 | 
						|
The final step of the upgrade process is to activate and complete the upgrade.
 | 
						|
This involves disabling 'compatibility' modes on all hosts and clearing the
 | 
						|
Upgrade Alarm.
 | 
						|
 | 
						|
.. only:: partner
 | 
						|
 | 
						|
    .. include:: /_includes/software-upgrades.rest
 | 
						|
       :start-after: software-upgrade-begin
 | 
						|
       :end-before: software-upgrade-end
 | 
						|
 | 
						|
.. _software-upgrades-section-N1002F-N1001F-N10001:
 | 
						|
 | 
						|
----------------------------------
 | 
						|
Rolling Back / Aborting an Upgrade
 | 
						|
----------------------------------
 | 
						|
 | 
						|
In general, any issues encountered during an upgrade should be addressed during
 | 
						|
the upgrade with the intention of completing the upgrade after the issues are
 | 
						|
resolved. Issues specific to a storage or worker host can be addressed by
 | 
						|
temporarily downgrading the host, addressing the issues and then upgrading the
 | 
						|
host again, or in some cases by replacing the node.
 | 
						|
 | 
						|
In extremely rare cases, it may be necessary to abort an upgrade. This is a last
 | 
						|
resort and should only be done if there is no other way to address the issue
 | 
						|
within the context of the upgrade. There are two scenarios for doing such an
 | 
						|
abort:
 | 
						|
 | 
						|
.. _software-upgrades-ul-dqp-brt-cx:
 | 
						|
 | 
						|
-   Before controller-0 has been upgraded \(that is, only controller-1 has been
 | 
						|
    upgraded\): In this case the upgrade can be aborted and the system will
 | 
						|
    remain in service during the abort, see, :ref:`Rolling Back a Software
 | 
						|
    Upgrade Before the Second Controller Upgrade
 | 
						|
    <rolling-back-a-software-upgrade-before-the-second-controller-upgrade>`.
 | 
						|
 | 
						|
-   After controller-0 has been upgraded \(that is, both controllers have been
 | 
						|
    upgraded\): In this case the upgrade can only be aborted with a complete
 | 
						|
    outage and a reinstall of all hosts. This would only be done as a last
 | 
						|
    resort, if there was absolutely no other way to recover the system, see,
 | 
						|
    :ref:`Rolling Back a Software Upgrade After the Second Controller Upgrade
 | 
						|
    <rolling-back-a-software-upgrade-after-the-second-controller-upgrade>`.
 |