This commit switches the time output to the elapsed time instead of the total time in the results summary at the end of subunit-trace. This is accomplished by just measuring the time delta right before we begin processing the result stream until right after. While this is not the most accurate method to measure the elapsed time, it should be sufficient. Previously just the total time was shown which could be misleading since it is just the sum of the execute time for the individual test methods (excluding the test fixtures). When running in parallel this number would usually be a fair bit larger than the elapsed time of the test run. By using the elapsed time instead it makes it easier to track the performance of the run. Change-Id: I7a1113c7f1333389b1b42249cafc4a45d630cb9f
8.1 KiB
Executable File
8.1 KiB
Executable File