738 Commits

Author SHA1 Message Date
Daniel Bengtsson
0f0bd4bd6f Oslo dates for Epoxy schedule.
Add Oslo specific dates for epoxy schedule.

Change-Id: I0bbb2fe546fc0003b26dba79056fa7e9827016fc
2024-11-12 08:41:45 +01:00
Thierry Carrez
5769c643a7 Add setuptools for publish-tox-docs-releases
Explicitly add setuptools as a dependency so that the call to
wheel.bdist_wheel in openstack_releases/links.py does not fail.

Change-Id: I66378e04db045e97f4d907eff0369738006291b1
2024-11-05 18:44:19 +01:00
Zuul
865cdabf48 Merge "Update I18n process with liaison" 2024-10-03 12:02:33 +00:00
Zuul
b89539534f Merge "Render a graph showing the SLURP and not SLURP upgrade paths" 2024-10-02 15:56:52 +00:00
Clark Boylan
026fc0186e Render a graph showing the SLURP and not SLURP upgrade paths
I think visual representation can help people understand the practical
effects of the SLURP releases on their upgrade options. Lets add one
using graphviz to do the rendering for us.

Change-Id: Ic28c8ad4bc84f094a37b38037a6859d725e85f51
2024-10-02 14:49:21 +00:00
Előd Illés
f2fdd3f51e Mark 2024.2 Dalmatian as released
Change-Id: I188e42ab3fe379a168c207b0bd90206425a9b863
2024-10-02 11:45:05 +02:00
Ian Y. Choi
7d034cc01b Update I18n process with liaison
- Clarify that string freezes are applied to I18n target projects
- Fix I18n PTL to I18n SIG per governance change
- Update release liaison for I18n

Change-Id: If256992882a50bebabc3d4873d8512f0f155fc1e
2024-10-02 03:22:32 +09:00
Jeremy Stanley
c8ea04eb95 Publish the 2025.1/Epoxy key for future use
This adds a listing for the 2025.1/Epoxy Cycle key fingerprint with
Monday 2024-10-07 (the week after the 2024.2/Dalmatian release) as
its start date, and links to an export of the corresponding public
key with initial attestation signature from the 2024.2/Dalmatian
Cycle key as well as the change author.

Change-Id: I0ed06b1b114d5a1e0dd80899c2c460d0a7069019
2024-08-23 14:17:59 +00:00
Előd Illés
de3825ac66 Proposed 2025.1 Epoxy release schedule
This is a proposed release schedule for OpenStack 2025.1 Epoxy.
26 weeks long cycle, with 2 April, 2025 as planned release date.

Change-Id: I71dc9a7593260180db0a01b722fe38271bbd0acd
2024-07-26 09:57:33 +00:00
Előd Illés
2a3251f820 Add d-mf to schedule
It seems that d-mf tag (Membership freeze) was missed from the original
schedule proposal patch, so fixing that by adding it to the usual
Milestone-2 week.

Change-Id: Ic9eed14995ed46233792c2322258732327252a8c
2024-06-14 15:37:48 +02:00
Jon Bernard
455fa2964a Add cinder specific dates for 2024.2 Dalmatian schedule
Change-Id: I3190d185c5c7c4281084bcdeb7827abc37db8850
2024-06-06 14:03:53 -04:00
Goutham Pacha Ravi
0903c33d67 Add dates for 2025.1/"E" elections
Publishing this information on the release
calendar so that we can avoid people missing the
call for nominations that we usually do later
in this Dalmatian cycle.

Election dates were proposed in
I2cb7351c1f474b092c81f71b5fcff3a2f68c241a

Change-Id: I129d48b549dcf7f1cf55cb4bfed20f99dc362f73
2024-06-05 22:28:16 -07:00
Sylvain Bauza
9aba7caf6a Nova deadlines for Dalmatian schedule
We agreed on those dates during the PTG.

Change-Id: I1b224e98c89bd5fafeb1ef7d8f87dc476ba84417
2024-05-17 10:31:35 +02:00
Zuul
1f5bc2a606 Merge "[manila] Change bugsquash date" 2024-05-06 06:27:28 +00:00
Zuul
169515c8c1 Merge "Add process step to check openstack map" 2024-05-03 13:21:56 +00:00
silvacarloss
b73d31d9fa [manila] Change bugsquash date
Signed-off-by: silvacarloss <ces.eduardo98@gmail.com>
Change-Id: I257e99a492c10bfb70fec41e809313f40dcdc291
2024-04-25 12:12:58 -03:00
Thierry Carrez
41f6f5dca2 Add process step to check openstack map
During Caracal release it was discovered late that the openstack map
could use a refresh ahead of release communications. Since we should (in
theory) know the contents of the release (in terms of deliverables)
after milestone-2, add a step in the process to have a look at the map
and submit any necessary changes well ahead of the release week craze.

Change-Id: I51674b19afce0ea7b32f93ee989dbbf9df926f90
2024-04-16 16:33:21 +02:00
Thierry Carrez
694e860be9 Fix erroneous dates in schedule details
Dalmatian release schedule had a few off dates for milestones in the
schedule details section. Also use US English format for dates, as the
project standardizes on US English for communications.

Change-Id: I59876e34091a651ec322635eb90578f457e8bd92
2024-04-12 14:50:00 +02:00
Zuul
5621bdbc74 Merge "update the cycle highlight date into the mail template" 2024-04-11 12:53:47 +00:00
Zuul
746e325772 Merge "Add Manila specific deadlines to the schedule" 2024-04-11 12:53:33 +00:00
silvacarloss
4005c0224a Add Manila specific deadlines to the schedule
Change-Id: I480a60f7d8aac077095eb107e25a5c1583e0e06e
2024-04-10 10:54:03 -03:00
Hervé Beraud
68fb1e2e14 update the cycle highlight date into the mail template
Change-Id: I3b8d5ad069035c0503b4c851660015533e83ac5b
2024-04-05 14:28:13 +00:00
Előd Illés
500dcdbc4b Mark 2024.1 Caracal as released
Change-Id: I4372b220eb9b0918a8da9dd0030e71861cfac408
2024-04-02 12:47:59 +02:00
Zuul
7b2537d0ce Merge "Publish the 2024.2/Dalmatian key for future use" 2024-03-28 11:00:09 +00:00
Zuul
f20f9a606f Merge "Add 2024.2/"D" Election timeline to the schedule" 2024-03-22 14:52:35 +00:00
Dr. Jens Harbott
97127bede1 Update for Unmaintained transition
We no longer have branches in extended maintenance state, these have
been switched to Unmaintained (eom). So we need to check for the latter
state when listing branches that could be deleted since the are EOLed.

Add oslo.utils to requirements since it is now needed by the
tools/delete_stable_branch.py script.

Change-Id: Ib948befa6f2706dc5dc50009b021af3a1bb389a8
2024-03-15 08:14:24 +01:00
Jeremy Stanley
4958895294 Publish the 2024.2/Dalmatian key for future use
This adds a listing for the 2024.2/Dalmatian Cycle key fingerprint
with Monday 2024-04-08 (the week after the 2024.1/Caracal release)
as its start date, and links to an export of the corresponding
public key with initial attestation signature from the
2024.1/Caracal Cycle key as well as the change author.

Change-Id: Ie9d1ab692893fdec2dfb99abf1e88efcfb31f693
2024-03-14 21:56:54 +00:00
Előd Illés
0722fc95d1 [process] Add section about zuul job cleanup to countdown mail
Teams tend to forget about clean up their unnecessary jobs or unused
special nodesets, etc. This patch adds a notification for the teams
to the process guide at week R-3.

Change-Id: I5f6a236b93ae0f4ed5b913aca8e3ebf6c2196f7f
2024-03-08 13:46:10 +01:00
Hervé Beraud
31528065d7
fix R-5 template
Cycle Highlights has been moved to R-4:
https://review.opendev.org/c/openstack/releases/+/906351

R-5's email template remains outdated.

Change-Id: I18265cfbc7158148b3b19ac512116b585f3f40ff
2024-03-01 10:38:55 +01:00
Tony Breeds
8510588cab Add 2024.2/"D" Election timeline to the schedule
When trying to add this I noticed that there are duplicate
'project-specific' in the schedule for R-7, merge into a single list.

Depends-On: https://review.opendev.org/c/openstack/election/+/905152
Change-Id: I5e4be324118c7c47118ba39a5d29c7046755c9ca
2024-02-29 00:24:46 +09:00
Előd Illés
b80fd319ee Add helper script to abandon open changes
To delete stable/<series> branches first we have to abandon all open
changes otherwise gerrit does not allow to delete the branch.
This script abandons all the open patches on a given project on a
specific branch.

Change-Id: I431fb305f998608889510f8ed2914583891d2167
2024-02-24 16:30:51 +01:00
Thierry Carrez
d9edb5248f Adapt language around highlights in R-5 email
Fix language used to drag attention to cycle highlights in R-5 release
status email as the deadline shifted.

Change-Id: Ie47ace9bb7c7473e977178ffce0b64cd8ee4b9c0
2024-02-23 15:32:34 +01:00
Zuul
176722add9 Merge "Update series statuses" 2024-02-19 06:53:05 +00:00
Zuul
abd91e0186 Merge "Update email template for week R-8" 2024-02-12 16:15:00 +00:00
Előd Illés
97e76562e0 Add list_eom_stale_branches.sh
This is based on the list_eol_stale_branches.sh script to make it
possible to delete stable/<series> branches where there are
<series>-eom tag already.

Change-Id: Iaaa9702c5b304152492ed2afc56ac07fb9c9fb98
2024-02-12 13:19:00 +00:00
Thierry Carrez
c182b20329 Update email template for week R-8
Update R-8 email template in PROCESS document to match the one that was
sent for 2024.1 Caracal cycle.

Change-Id: I453ffa9e7b022a01c178d082d551543ab6ce16cc
2024-02-09 16:11:27 +01:00
Zuul
c8b7973c19 Merge "Fix cycle highlight deadline" 2024-02-09 14:18:24 +00:00
Elod Illes
dd195342ca Update series statuses
- Train and Ussuri will transition to End of Life
- The last 3 series in Extended Maintenance will transition to
  Unmaintained (Xena, Wallaby, Victoria)
- Yoga is now Unmaintained
- Zed and newer branches will transition to Unmaintained after their
  3rd subsequent series is officially released (~18 months)

This patch also:
- extends the note about the maintenance phases
- refines Zed's planned transition date to Unmaintained to a less busy
  date, ~1 month after the official 2024.1 Caracal release

Change-Id: I860f5056a5563c1e8377dfc7d4f9c31f28912e3c
2024-02-09 12:20:07 +01:00
Előd Illés
537e8c49f8 Proposed 2024.2 Dalmatian release schedule
This is a proposed release schedule for OpenStack 2024.2 Dalmatian.
26 weeks long cycle, with 2 October, 2024 as planned release date.

Change-Id: I8bf5d0ade01a81b1cfd340dce42e31d74a999a96
2024-01-24 17:22:21 +01:00
Előd Illés
e7df1b2093 Fix cycle highlight deadline
We agreed with PTLs and Foundation some cycles ago that the cycle
highlights deadline can be at week R-4, just after Feature Freeze.
Otherwise Feature Freeze week would be too busy for PTLs (it's
busy enough with dealing the FF itself).

Change-Id: I5f10342120d01781c29ee72856f36a15f3d4fcae
2024-01-23 09:48:47 +01:00
Zuul
1c76064895 Merge "Add Manila milestones to the Caracal schedule" 2024-01-18 15:46:55 +00:00
Hervé Beraud
8d5f84346a
Fix rendering of Oslo's specific events
Oslo's specific events are not properly rendered
due to a yaml duplicated sections.

This patch fix that.

[1] https://releases.openstack.org/caracal/schedule.html
[2] https://releases.openstack.org/caracal/schedule.html#oslo

Change-Id: If5a359b3c48a16b811f5e347d414b8c78aaccc87
2024-01-16 14:49:36 +01:00
Dmitriy Rabotyagov
94838cd5e6 Rename extra-etcs to extra-acs
It has been agreed to use term Active Contributors rather then
Active Technical Contributors across the board to highlight importance
of non-technical contributions.

Depends-On: https://review.opendev.org/c/openstack/governance/+/893831
Change-Id: I067e703ef52a16e18bc6de76f7c8842a2726cb42
2023-12-14 15:47:25 -08:00
silvacarloss
1e87dd1ccc Add Manila milestones to the Caracal schedule
Change-Id: If2aed91903810edb72a68ae7f0f80d6eec6ea2c2
2023-11-30 11:40:20 -03:00
Zuul
009e281b03 Merge "Nova deadlines for Caracal schedule" 2023-11-23 13:37:42 +00:00
Hervé Beraud
797777942f Remove series goals from M1 email template
Series goals are now longer applicable however, goals
still exists so replace the corresponding section in our M1
email template.

Change-Id: I754af9aa7a4cc02f46592628e1c0a18170ea55df
2023-11-22 11:40:11 +01:00
Sylvain Bauza
06f0f83706 Nova deadlines for Caracal schedule
We agreed on the deadlines during the previous PTG.

Change-Id: I80687b7a40aa7a99f290c24e9365ef9b7d903dbc
2023-11-21 19:28:56 +01:00
Rajat Dhasmana
592a66819a Add cinder specific dates for 2024.1 Caracal Schedule
Change-Id: If8019603113280a7579b490bb46d02f9aa7a0c4e
2023-11-01 17:53:20 +05:30
Hervé Beraud
bb48a46b73 fix process email content
Change-Id: I03027eff8d701310b429714f970f4440c39e0a42
2023-10-12 15:24:32 +02:00
Zuul
1acc931d66 Merge "Publish the 2024.1/Caracal key for future use" 2023-10-09 15:04:14 +00:00